Fly Ash Brick Dealership Auction
Construction Of 01 No. Air Crossing By Use Of Rcc Work And 10 Nos. Ventilation Stoppings By Use Of Fly Ash Brick In Panel No. 17r Depillaring Distt. Cm Panel Of 4a Scam At Haldibari U.g.
Construction Of Fly Ash Brick Retaining Wall Along Cisf Boundary Wall At Ntpc Barh
Gem Bids For Boq, Demolition Of Brickwork Built In Cement Mortar, Materialand Labour For Brick Work With Fly Ash Bricks, Supply Andfix In Repair Powder Coated Aluminium Three Track Slidingwindow, Taking Down Cement Plaster On Wall And Celling., Material And Labour 15Mm Thick Rendering In Cementmortar, Material And Labour For Prep Of Plastered Orunplastered Surfaces Of Walls
Purchase Spare Parts- Cement, Water, Plasticizer, Fly Ash, Coarse, Fine, Stone / Boulder, Reinforced Cement Concrete, Steel Bars, Mild Steel & Structural Steel, Bricks/f.p .s. Brick Tiles, Fly Ash Bricks, Terrazzo Tiles, Kota Stone, Glazed Tiles, Granite, Flush Door Shutter, Aluminum Sections, Paving Block, Sal Wood, Pvc Pipes, Synthetic Enamel Paint, Granular / Gsb, Water Bound Macadam, Wet Mix Macadam, Prime Coat / Tack Coat, Bituminous Macadam, Dense Bituminous Macadam / Bituminous Concrete, Masti C Aspha Lt, Thin & Ultra- Thin White Topping, Seal Coat, Glass Beads, Water Proofing Compound, Thermoplastic Paints, Galvanizing, Rcc Pipe For Repairs At The Yerwada Hot Mix Plant
Gem Bids For Custom Bid For Services - Manufacturing Of Fly Ash Bricks Atmunpl Ash Brick Plant /
Providing Open Gym Equipment - Earth Work Excavation For Foundation In All Kinds ...lling The Sides With Excavated Earth Etc. Complete Supplying Stone Dust And Filling In Regular Laye...ting Etc. Complete For Foundation, Basement, Etc. Plain Cement Concrete Work 1:4:8 (1 Cement, 4 Crus...etc. Complete For Foundation, Etc. Upto Basement Brick Work With Fly Ash Bricks Of Size 230mm X 110m...ick Walls Upto Basement (upto 1m High Above G.l.) Plastering With Cement Mortar 1:4 (1 Cement And 4 ...sand) 12mm Thick Including Curing, Etc., Complete. Painting The New Plastered Walls With Two Coats Of...ion And The Durability Period Should Be 3 Years... Paving The Flooring With Cement Concrete Tiles H...g Pointing With Colour Cement Etc., Complete,(isi) Supply And Fixing Of Push Pull Up Chair Promotes ...st / Foot Paddle For Long Lasting Life At Dr. Ambedkar Play Ground In Division - 92, Unit - 20, Zone - Vii
Erection Of 04 Four Nos. Of Fly Ash Brick Ventilation Stopping In Rvii Seam Of Shyamsundarpur Colliery.
As Per Bid Doc Supply, Installation, Commissioning, Trial Run Of Semi Automatic Fly Ash Brick Plant Korba
Supply Of Construction Materials - Cement, Grit, Iron Rod, Binding Wire, Fine, Brick, Murum, Sand, Fly Ash, Fertilizer, Grill, Geru