Strengthening Of Rcc Foundation And Ms Base Frame Of 3.4 Mgd Pump Set No.02, 04 And 06 At Ghonda-i Sps.
Repairing Of Ms Base Frame, Foundation With Allied Work At C Block Vivek Vihar Sewage Pumping Station
Construction Of 01 No Ptr Plinth, Ct, Pt, Vcb Foundation Plinth, 01 No Cable Frame Supporting Structure Foundation Plinth, Cable Trench, Operational Slabs, Concreting Near 11Kv Isolator Structure And Extended Portion Of Switchyard, Civil Work
Changing Of Gear Box, Pinion, Foundation Frame, Trunion Ring, Mill Fan Casing, Impeller And Anchor Bolt Of Trunion Bearing Foundation Of Ball Mills For Tpp Side Mill System
Supply Of 1 Complete Plate Heat Exchanger Withht Plates Gaskets Frame And Foundation; Technical Specificationas
Fabrication And Erection Of Steel Base Frame With Pcc Foundation For 28 Lps Pump Motor Set At Filter Plant Of Township, Rajrappa Area
Gem Bids For Ae Cable Way , Electric Motor And All Other Speicification As Per Rfp , Electric Control Panel Board And All Other Speicification As Per Rfp , Dg Set And All Other Speicification As Per Rfp , Assy Driving Unit Gear Box And All Other Speicification As Per Rfp , Steel Wire Rope And All Other Speicification As Per Rfp , Hook Pully And All Other Speicification As Per Rfp , Turn Buckle And All Other Speicification As Per Rfp , Thimble And All Other Speicification As Per Rfp , Pre Fabricated Moified Anchorage And All Other Speicification As Per Rfp , Wire Rope Grip And All Other Speicification As Per Rfp , Pre Fabricated Moified Main Tower And All Other Speicification As Per Rfp , Foundation Frame And All Other Speicification As Per Rfp , Rope Trolly And All Other Speicification As Per Rfp , Roller Machine And All Other Speicification As Per Rfp , Plier And All Other Speicification As Per Rfp , Adjustable And All Other Speicification As Per Rfp , Spanner And All Other Speicification As Per Rfp , Tester And All Other Speicification As Per Rfp , Hammer And All Other Speicification As Per Rfp , Insulated Copper Cable And All Other Speicification As Per Rfp , Insulating Tape And All Other Speicification As Per Rfp , 40 Mm Gi Pipe And All Other Speicification As Per Rfp , Complete Earthing Set And All Other Speicification As Per Rfp , Cement And All Other Speicification As Per Rfp , Coarse Sand And All Other Speicification As Per Rfp , Coarse Aggregate And All Other Speicification As Per Rfp , Coarse Aggregate And All Other Speicification As Per Rfp , Mild Steel Bars And All Other Speicification As Per Rfp , Gi Binding Wire And All Other Speicification As Per Rfp , Plywood And All Other Speicification As Per Rfp , Nails And All Other Speicification As Per Rfp
Earth Work And Land Development, Foundation, Structural Frame Works, Electrical And Plumbing Works Etc. Construction Of New Building For Chinnammu Amma Memorial Ladies Hostel Complex - Phase 1
Repairing Of Equalizer Bar, Idler Yoke Shaft, Track Frame Covers, Carrier Roller Foundation, Repairing Of Radiator Front Side Cover, Removing And Fixing Of 2 Track Roller Removing Of 1 Track Shoe Both Side Of Dozer Sl. No. 13616 Of Dakra Project.
Repairing, Welding, Denting Of Drill Mast Stand And Its Foundation Base And Cat Frame Of Rel Iii And Iv Drill Machine Working At Bina Project.