Solar Tree Floor Foundation And Solar Energy Work At Chhatikara T-junction In Radhakund Nagar Panchayat.
Supply, Erection, Installation And Commissioning Of 9 Mtrs Mini High Mast Light Led Lighting Arrangement Along With Civil Work Construction And Foundation Aic/Aed/Niet-426/25-26/Gr 2
Supply, Erection, Installation And Commissioning Of 9 Mtrs Mini High Mast Light Led Lighting Arrangement Along With Civil Work Construction And Foundation Aic/Aed/Niet-426/25-26/Gr 3
Balance Work For Foundation Work For Installation Of Fixed Double Column 3 Axis Cnc Vertical Milling Machine Wtm Automatic Cut To Length Machine Prm Inside Factory Premises
Earth Work, Filling Foundation, Cc M10 12mm C, P, White Washing, Supply And Fixing Of M.s.angle, Welded Wire Mesh And Gi Barbed Wire. M.r To Gate Shaft Odisha Tunnel For The Year 2025-26 Such As Fixing Of G.i. Wire Mesh Fencing To Boundary And Repair To Existing Masonry Walls.
Cement Concrete 1 2 4, Brick Work, Earth Work, Filling Foundation, Fixing Of Tiles, 12mm Cp, Fix. A, I, Door, Finishing Wall Surface With Acrylic Wall Putty, Priming And Painting, Ceiling, Rcc M-10, Centering And Shuttering, Hysd Bar, And Complete Sanitary Work Repair And Renovation Of Wash Room At Office Building Of Earth Dam Division, Chitrakonda For The Year 2025-26.
Earth Work, Filling And Foundation Cc M 10 And M15, Srailing With Steel 304 Grade, Rcc Work With Centering And Shuttering And Filling Foundation And Plinth. Installation Of Floating Jetty At Launch Ghat Connection And Improvement Of Road To Floating Jetty And Railing To Road Of Launch Ghat.
Earth Work, Filling And Foundation Cc M15, Supply Ms Pipe, Gci Sheet Fixing, Brick Work 12mm C, P,, Cc M20 Hysd Bar Fixing Of Tiles Cc M-35 Deeping Of Bore Well And Grouting/ Sinking Of Bore Well And Construction Of Shed With Protection Of Slope From Main Road To Left Flank Of Spillway For The Year 2025-26.
Earth Work, Filling Foundation, Cc M10, Brick Work, Supplying Fixing Ms Angle, Wire Mesh, G.i.barbed Wire Iron Work And Gated Door And Wind With White Washing. M.r To Water Supply Head Works For The Year 2025-26 Such As Construction Of Wire Mesh Fencing Boundary Wall Around 80 H.p. Pump House Including Completion Of Balance Masonry Walls.
Construction Of New Building Civil Work, Plumbing Work, Electrical Work With Kseb Connection, Computer Network, Telephone Cabling, Work Station And Furniture, Foundation And Inauguration Stone Fixing Construction Of Edakkunni Smart Village Office At Thrissur Taluk, Thrissur District