Doubling Of Track Between Trivandrum And Kanniyakumari -proposed Construction Of New Tunnel No 5 As Cut & Cover Tunnel To Accommodate Single Track, Earth Work In Forming Bank/cutting Between Ch 258840 And 270400 (except Ch:264000- Ch 264600 @palliyadi Station), Extension Of Minor Bridges, Protective Works, Retaining Wall, Gabion Wall Cutting Side Drains, Construction Rob No 212 And Other Miscellaneous Works Between Kzt & Erl Stations.
Construction Of Gabion Wall For Strengthening Of Newly Constructed Op Tower From Bp No 921m To 957m In Aor Of 123 Bn Bsf Under Shq Bsf
Im Of Rd Fm Charikaria Bridge To Sankardev Path At Charikaria River Bridge Approach Near Dhakuakhana Chariali For Mitigation Of Disasters Through Vetiver-enhanced Slpe Stabilization And Gabion Wall Integration Under Sdmf For The Yr 2025-26
Removal Of Landslides, Construction Of Counterfort Wall, Cc In M-15 And Gabion Wall At Rd 49/815 To 49/837.375 Restoration Of Damages Shahpur Sihunta Chowari Road Km 40/00 To 53/00 Under Pdna
Constructing Gabion protection wall at village lake (survey no.1185) near Mahakali Mata temple At village Rangpur Taa. Mansa Dist. Gandhinagar
C/O Gabion Crate Wire R/Wall At Rd. 11/760 To 11/785. Restoration Of Road Damages On Mandi Gagal Chailchowk Road Km 0/0 To 16/190
Construction Of Toe Crate Wall And Gabion Pitching On Left Side Of River Jhelum At Malpora Tokina Rd 22400m
Contruction Of Gabion Wall For Rehabilitation Houses At Taliye, Tal.mahad, Dist.raiagd
Design And Construction Of 03 Vup At Billowa Tiraha 1197.280 Kalyani Chauraha 1200.250 And Arru Tiraha 1216.000 For Permanent Rectification Of Morth Identified Blackspot Locations Along With Gabion Wall In Jaurashi Ghati 1192.000 To 1192.700 Lhs And
Construction Of Gabion Type Breast Wall At Different Locations Of Ranikor Moheshkhola Baghmara Road Sh-04 From Km 30.000 Nongjri To Km 129.385 Baghmara In The State Of Meghalaya In Fy 2025-26. Nhidcl / Ro-shg / Ranikor-maheshkhola - Baghmara /sh-4/2025/01/