Gem Bids For Custom Bid For Services - Maintenance Of Instruments Installed At Blast Furnance Compressed Air Station Gas Mixing And Boosting Station Weigh Bridges Central Instrumentation Laboratory Ldcp And Auxiliaries Along With Gas Analyzer For A Period Of ..
Providing Of Separate Gas Mixing Station For New Dolomite Plant, Dsp
Supply of Split Tube Furnace With Two Channel Gas Mixing Station And Vacuum Flanges With Fittings Q3
Operation And Maintenance Of Blast Furnace Top Equipments Including Blt, Stove Equipments, Combustion Air Fan, Waste Gas Heat Recovery Station, Gas Mixing, Boosting Station, Snort Valve And Utility Network For 4506M3 Bf Complex For A Period Of Two 2 Years
Operation And Maintenance Of Blast Furnace Top Equipments Including Blt, Stove Equipments, Combustion Air Fan, Waste Gas Heat Recovery Station, Gas Mixing, Boosting Station, Snort Valve And Utility Network For 4506M3 Bf Complex For Aperiod Of Two Yrs
O And M Of Blast Furnace Top Equipments Including Blt, Stove Equipments, Combustion Air Fan, Waste Gas Heat Recovery Station, Gas Mixing, Boosting Station, Snort Valve And Utility Network For 4506M3 Bf Complex Pkg-Q7qw-029 In Respect Of 3.0 Mtpa Is