Supply Of Ms And Gi Pipelines Make: Tata/jindal/any Isi For Fire Hydrant, Clarified Water, Ecs, Air Washer Systems And Other Pipelines In Gt And Stg Areas At Ggpp, Jegurupadu Godavari Gas Power Plant
Repairing Of Transfer Valve Of Heat Exchanger Of Unit 4 Of Gas Thermal Power Plant, Baramura, Khowai, Tripura
Hiring Of Vehicles For 2 X 363.3 Mw Gas Based Combined Cycle Power Plant, Palatana, Udaipur, Tripura
Custom Bid For Services - 200138167 Water Balance Audit At Ntpc Jhanor Combined Cycle Gas Power Plant.
Supply Erection, Dismantling, Re-Assembly Commissioning Of Gt Insulation Including Repairing Of Material For Alstom Make Gt 26 Gas Turbine At Utran Gas Based Power Plant
Renovation Of Existing Double Storied Gci Sheet Roofed Bachelor Barrack No.1 To Accommodate The Existing O/O The Dgm, Gted Office As Required Related To Upcoming 120Mw Ccgt Power Plant At Rokhia Gas Thermal Project
Procurement Of Miocron Filter Catridge For Uf Ro Plant At Kawas Gas Power Project
Overhauling Of Gtg Turbo-Generator Tari Type- 930-36P4 Of 65.42 Mw At 101 Mw Tripura Gas Based Power Plant Monarchak, Neepco, Tripura As Well As Major Overhauling Of 35.58 Mw Stg Steam Turbine Including Governing System Plus Generator
Overhauling Of Gtg Turbo-Generator Tari Type- 930-36P4 Of 65.42 Mw At 101 Mw Tripura Gas Based Power Plant Monarchak, Neepco, Tripura As Well As Major Overhauling Of 35.58 Mw Stg Steam Turbine Including Governing System Plus Generator
Carrying / Transportation Of Drinking Water By Truck / Mechanical Transport From D. W. S. Sources From Jirania I. R. Plant To Gas Thermal Power Plant