"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders for gas soldering kit

Total 4 tenders found
#TBR: 36090135 Live

Security Services

  • Haryana
  • Due On: 30 Dec, 2025 (10 Days Left)

Gem Bids For Upgradation, Digital Multimeter, Digital Soldering Station, Digitalmicroscope, 53 Pcs Telecommunication Tool Kit, Fireextinguisher 4 5 Kg, Gas Operated Soldering Iron Pros Kit, Desktop I5 13Th Gen 8Gb Ram 1 Tb Ssd 1 Kva Ups Andcolour Printer, Magnifying Glass With Lamp 5X10xaltsgoose Neck, Esd Workstation Esd L5 X W3 X H6 Feet, Esdchair Revolving Ohmshield, Esd Clothing Blue, Epoxyflooring 20 X 40 With Installation Star Epoxy, Air Curtain 4Standard, Dc Regulated Power Supply 60Volt 10Amp, Battery Operated Screw Driver Kit, Hot And Cold Ac 2 Ton, 5 Shelves Metal Rack Stainless Steel 5 X 3 Feet, Plasticcomponent Organizer, Smoke Absorber Fume Extractorpros Kit 59Jb, Desktop Spectrum Analyzer Rs Pro Isa 730150Khz 3Ghz, Laminar Flow Station Op 10, Esd Shoedispenser With 100 Refills

Ref. Document
View Tender
#TBR: 35893884 Closed

Power

  • Tamil Nadu
  • Due On: 06 Dec, 2025 (0 Days Left)

Gem Bids For Butane Gas Soldering Kit, Self Igniting & Adjustable Flame, Wattage: 80-125 W

Ref. Document
View Tender
#TBR: 31692264 Closed

Railway Transport

  • Jharkhand
  • Due On: 10 May, 2024 (0 Days Left)

Supply of Gas Soldering Iron Kit, Nylon Tool Bag, Eyelet & Galvanised Bolt With Nut And Washer.. Nylon Tool Bag Backpack Waterproof Heavy Duy For Tools 18 Inch Height I.E. 34 X 34 X 16 Cm W Arranty Period: 30 Months After The Date Of Delivery Supply Of Proskit Gas Soldering Iron Kit-Autoignition Gs-200K Or Similar. Warranty Period: 30 Months After The Date Of Delivery Supply Of Eyelet 10 Sq Mm Aluminium Warranty Period: 30 Months After The Date Of Delivery Supply Of Eyelet 25 Sq Mm Aluminium Warranty Period: 30 Months After The Date Of Delivery Supply Of Galvanised Bolt With Nut And Washer As Follows: Bolt Size: 10 X 63Mm, Nut: 2 Nos, Was Her- 2 Nos, Spring Washer- 01 Nos. Warranty Period: 30 Months After The Date Of Delivery Supply Of Proskit Gas Soldering Iron Kit-Autoignition Gs-200K Or Similar. Warranty Period: 30 Months After The Date Of Delivery

Ref. Document
View Tender
#TBR: 29252204 Closed

Education And Research Institutes

  • Gujarat
  • Due On: 16 Sep, 2023 (0 Days Left)

Supply of Dye Penetrate Test Kit, 22 Earthing Clamp Electrode Holder Machine Lamp Cable Plug Dye Penetration Test Kit Soldering Iron Acetylene Gas Cylinder Carbon Dioxide Gas Cylinder

Ref. Document
View Tender
Download Document