Sh-re-modelling/shifting Of Old Gi/di/upvc Pipeline From Suknacherra Sb School To Satnala Tsr Camp Via Ganganagar L- 5.21 Km Under Dasda Rd Block Area Under Dws Sub-division Dasda During The Year 2025-26. Rws / Jjm / Ridf/nrdwp/15th Fc/fdr Fund During The Year 2025-26 .
Repair/Renovation To Various Residential Buildings Under Division No.Iii Shimla. Sh- Providing Placing Pvc Water Storage Tanks, Steel Work For Tank Staging, Water Proofing Work, P/L G.I. Pipeline 15Mm 25Mm Dia, Painting Distempering Work
Laying, Jointing, Shifting And Dismantling Of 6 Inch 150 Mm And 8 Inch 200 Mm Diameter Ms/gi Pipeline, For Dewatering From Active Coal Faces And Various Sumps For 730 Days As When As Required At Bina Project.
Upgradation Of 4 Dia And 2 Dia Gi Pipeline For Drilling Water At 300L And 400L Underground At Gumgaon Mine
Repair/renovation To Various Residential Buildings Under Division No. Iii Shimla. Sh- Providing Placing Pvc Water Storage Tanks, Steel Work For Tank Staging, Water Proofing Work, P/l G.i. Pipeline 15mm 25mm Dia, Painting Distempering Work
Providing, Laying, Jointing, Testing And Commissioning Of G.I. Pipeline Pipeline Under Sansad Nidhi, Vidhayak Nidhi At Different Places Of Zone Of Zone No.02 Ward No.68 As Per Schedule
Providing, Laying, Jointing, Testing And Commissioning Of G.I. Pipeline Pipeline Under Sansad Nidhi, Vidhayak Nidhi At Different Places Of Zonel Of Zone No.09 Ward No.26 As Per Schedule
Water Supply Gi Pipeline Work Gi Pipeline Work Navin Wasti Beide Goving Park6 Galli Kumbhephal Tq.Ch.Sambhajinagar
Maintenance Of G.I. And C.I. Pipeline Network In Ac-24 Patel Nagar Constituency Under Eecivil-16 After 01/12/2025. Nit No. 132025-26 Item No. 6
State Plan 2025 2026Carwss To Alakodu Adjoining Villages Replacing Corroded 80Mm Gi Pipe Line With Newly Laid 80 Mm Gi Pipeline At Alakkode Inchiyani Road In Alakodu Panchayathpipeline Work