(i) Construction Of New Lhs In Lieu Of Lc Gate No.17/a/1 By Railway's Relieving Girder Under Aen/ndae. (ii)construction Of New Lhs In Lieu Of Lc Gate No.17/a/t By Railway's Relieving Girder Under Aen/ndae. (iii)construction Of New Lhs In Lieu Of Lc Gate No.17/a/6 By Railway's Relieving Girder Under Aen/ndae. (iv) Construction Of New Lhs In Lieu Of Lc Gate No.18 By Railway's Relieving Girder Under Aen/ndae. (v)construction Of New Lhs In Lieu Of Lc Gate No. 12a/1 By Railway's Relieving Girder Under Aen/ndae.
Painting Of Various Steel Girder Bridges In Mb-dli-sre-ldh Section And Sir-una- Aadr Section Of Umb Division Under Jurisdiction Of Sse/br/m/umb.
Provision Of Side Pathway On Owg Br. No. 62 A Dn (1 X 61.0 M), Br. No. 102 Dn (1 X 45.7 M), Br. No. 172 Dn (1 X 61.0 M) & Br. No. 292 (1 X 30.5 M) On Rpj-bti And Steel Girder Br. No. 180 (1 X 19.49 M) On Bti-sgnr Section Under Jurisdiction Of Sse/br/m/umb.
(a) Pune-mrj Elimination Of 12.20 M Girders By Precast Psc Slabs (03bridges) (04 Spans) Of Pa-mrj Section. (br. No. 25/3, 30/1 & 45/1) ) Project Id- 01.04.32.25.3.53.010. (b) Pune-mrj Elimination Of 12.20 M Girders By Precast Psc Slabs (04 Bridges) (05 Spans) Of Pa-mrj-kop Section. (br. No. 86/2,246/2,1/1 & 1/2) ) Project Id-01.04.32.25.3.53.011.
Part-a:-jabalpur Division : Provision Of Sacrificial Height Gauges 24 Nos. At 12 Locations (with Steel Girder). Part-b :- Jabalpur Division: Jabalpur Division Replacement Of Non - Standard Height Gauge At 6 Location (12 Nos.).
Renewal Of Channel Sleepers Using H-beam In Girder Bridges Under The Jurisdiction Of Sr.den/north/bpl Section.
Tiruchchirappalli Division - Villupuram Tiruchchirappalli (main Line) Section: Proposed Construction Of Road Over Bridge In Lieu Of Lc No. 138 At Km 185/300- 400 With 1x36m Effective Span Steel Composite Girder Including Limited Height Subway Of Size 6m X 2.85m In Between Panruti And Melpattambakkam Stations.
Construction Of Rcc Girder Bridge Over North Koyal River In Daltonganj To Chainpur Road In Chainpur Block Under Road Division, Daltonganj For The Year 2025-26 Construction Of Rcc Girder Bridge Over North Koyal River In Daltonganj To Chainpur Road
Name Of The Work:-1) Telecom Arrangement In Connection With Augmentation / Upgradation Of Freight Wagon Maintenance Infrastructure Facilities At Kzj / C&w/ Depot. 2)kzj-bza Section : Upgradation Of Cops With New Sheeting( Ss Gutter,new Sheeting) & Provision Of Additional Pf Under Aden/s/kzj (kdm,nkd,gla,ygl,cle,taa,guu). 3) Kzj-bza Section :construction Of Additional Cop Under Aden/mdr Section (irs Type Cop At Ckn,bkl,yp And Bus Type Shelters At Ckn,bkl,mtmi,tngm,gnn,cvv). 4) Kzj-bza Section- Proposed Construction Of Limited Height Subway(lhs) New Bridge No. 559(a) Km 421/33-35 In Lieu Of Closed Level Crossing (tresspassing Location) At Kesamudram Station Yard As Precast Rcc Box Of Size 1x3.00x2.65m By Air Pushing Method. 5)pdpl-krmr Section: Telecom Arrangements In Connection With Four Laning Of Karimnagar-warangal Section Of Nh-563 From Design Ch.48.860 Km (near Sh-i Ch. 170.400 Km) At Manakondur Bypass To Design Ch. 116,875 Km (existing Ch. 144.050 Km) At Palvelpulla Near Hanamkonda (design Length 68.015 Km) In The State Of Telangana On Hybrid Annuity Mode Under Bhartrnala Pariyojana Construction Of Four Lane Rub At Rly.chainage Km 29/12-13 Between Peddapalli Karimnagar Stations On Peddapalli-nizamabad Section Of Secunderabad Division At Km.51,/225 On Nh563 - Shifting Of Underground Ofc Telecom Cables At Rub. 6) Kzj-bza Section - Proposed Construction Of New Bridge No. 548 (additional Vent Way) (up & On Line Portion) As Precast Rcc Box Of Size 16.00x3.oort1 At Km 418/2-4 Between Intekanne And Kesamudram Stations By Air Pushing Method Using 20.40m Rh Girder. 7) Kzj-bza Section Proposed Construction Of New Bridge No. 550a (additionalvent Way) (up & Dn Line Portion) Asprecast Rcc Box Of Size 1 X6.00x3.oom At Km 418/4-6 Between Intekanne And Kesamudram Stations By Air Pushing Method Using 20.40m Girder. -------14) Dkj-mugr: Telecom Portion For Proposed Manning Of Existing 4 Unmanned Lc Gates On Lead Line Of Ktps Siding. (14 Works)
Construction Of Proposed Rob No.424 At Km 745/25-27 Between Srikakulam-urlam Stations. Spans:1 X 51.0m Cg + 2 X 18.0m Cg + 7 X 30.0m Psc Girder + Re Walls On East Coast Railway.