Excavation For Foundation / Pipe Trenches In Earth, Soils Of All Types, Sand, Gravel And Soft Murum, Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below, Stacking And Spreading As Directed, Normal Dewatering, Preparing The Bed For Foundation And Excluding Backfilling, Etc. Complete , Providing Dry Trap /granigt/quartizite/gneisses Rubble Stone Soiling In 15cm To 20 Cm Thicknlayers Including Hand Packing And Compacting Etc , Providing And Laying In Situ, Following M10(1:3:6) Grades Of C.c.of Trap / Granite/ Quartzite/ Gneiss Metal For Foundation And Bedding Including Dewatering, Formwork, Compacting And Curing, Finishing, Etc. Complete. , Providing Second Class Burnt Brick Masonry With Conventional / I.s.type Bricks In Cement Mortar 1:6 In Plinth As Backing In Composite Masonry Including Bailing Out Water Manually, Striking Joints, Raking Out Joints And Watering Etc Complete. , Providing And Casting Insitu C.c. Of Trap / Granite / Quartzite / Gneiss Metal Of Approved Quality For Rcc Work As Per Detailed Drawings And Designs Or As Directed By Engineer-in-charge Including Normal Dewatering, Centering, 'plywood Formwork, Bully / Steel Prop-ups, Compaction, Finishing The Formed Surfaces With Cm 1:3 Of Sufficient Minimum Thickness To Givea Smoot Hand Even Surface Wherever Necessary Or Roughening If Special Finish Is To Be Provided And Curing,etc. Complete. (by Weigh Batching And Mix Design For M-250 And M- 300 Only. Use Of L & T, A.c.c., Ambuja, Birla Gold, Manikgad,rajashree,etc.cement Is Permitted) (excluding M.s,or Tor Reinforcement) , Providing Internal Cement Plaster Of 12mm Thik Chamber Single Coat In Cement Mortor 1:4 Without Nerru Plaster Finish To Concrete Or Brick Surface In All Position Including Scaffolding And Curing Etc Completed. ,providing And Fixing In Position Steel Bar Reinforcement Of Various Diameters For Rcc Piles, Caps, Footings, Foundations, Slabs, Beams, Columns, Canopies, Staircases. Newels, Chajjas, Lintels, Pardies, Copings, Fins, Arches, Etc.as Per Detailed Designs, Drawings And Schedules; Including Cutting, Bending, Hooking Thebars,binding With Wires Or Tack Welding And Supporting As Required,etc. Complete (including Cost Of Binding Wire) Is 1786, (bd-f-17/306) ,providing, Laying And Fixing P.v.c.pipe Of 110 Mm Dia.with Fittings Such As Bends, Tees, Reducers, Clamps, Etc.including Necessary Excavation, Trench Filling Etc.complete. Includin Gremoving Existing Pipe Line If Necessary And Conveying And Stacking The Same In Pwd Chowky Or As Directed Etc. Complete ,10% Special Item For Pvc Pipe , Providing And Fixing 20 To 25 Mm Thick Rough Shahabad Box Type Waterproofing For Base Ment Orunder Ground Floor On A Base Of Cement Concrete 1:3:6, Including Subbase Of 2.50 Centimeter Thick Cementmortar 1:3 With Conceal,secrete(rmw),algae Proofor Other A Like Waterproofing Liquids,raking Of Joints Upto 35mm Depth,filling The Joints With 6mm Size Crushed Metal,hand Grouting With Cement Slurry,curing And Cleaning,with 7 Year Sguaran Tee On Courtfee Stamp Of Rs.100/-with Ponding Test Etc Complete. (excluding Cement Concrete1:3:6 Base Concrete ) Sub Work No 2 Dewats- For Anarobic Baffled Reactor- Item No1:-excavation For Foundation / Pipe Trenches In Earth, Soils Of All Types, Sand, Gravel And Soft Murum, Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below, Stacking And Spreading As Directed, Normal Dewatering, Preparing The Bed For Foundation And Excluding Backfilling, Etc. Complete Item No 2:- Excavation For Foundation / Pipe Trenches In Hard Murum Including Removing The Excavated Material Upto A Do\istance Of 50 M & Lift As Below Stacking And Sprading As Directed Dewatering Shoring & Struting Preparing The Bed For The Foundation & Neccesary Back Filling Etc Comp Item No 3:- Excavation For Foundation / Pipe Trenches In Hard Murum Boulders Including Removing The Excavated Material Upto A Do\istance Of 50 M & Lift As Below Stacking And Sprading As Directed Dewatering Shoring & Struting Preparing The Bed For The Foundation & Neccesary Back Filling Etc Comp Item No 4 :-excavation For Foundation / Pipe Trenches In Soft Rock And Old Cement And Lime Masonry Foundation Asphalt Road Including Removing The Excavated Material Upto A Distance Of 50 M & Lift As Below Stacking And Sprading As Directed Dewatering Shoring & Struting Preparing The Bed For The Foundation & Neccesary Back Filling Etc Comp Item No. 5- Providing And Laying In Situ Cement Concrete M-15 Of Trap/ Granite / Quartzite / Gneiss Metal For Foundation And Bedding Including Bailing Out Water,form Work, Compaction, Curing, Etc.complete (cement 5.90 Bags /cum) Spec. No. - Bd E /1 Page No. 287 And B- 7, Page No. 38 A) In Pcc M-150 Item No. 6-providing And Casting In Situ C.c. Of Trap / Granite/ Quartzite / Gneiss Metal Of Approved Quality For Rcc Works As Per Detailed Drawings And Designs Or As Directed By Engineer-in-charge Including Normal Dewatering, Centering, Form Work, Compaction, Finishing The Formed Surfaces With C.m. 1:3 Of Sufficient Minimum Thickness To Give A Smooth And Even Surface Wherever Necessary Or Roughening If Special Finish Is To Be Provided And Curing, Etc. Complete. (by Weigh Batching And Mix Design For M-250 And M- 300 Only. Use Of L&t, A.c.c., Ambuja, Birla Gold, Manikgad, Rajashree, Etc. Cement Is Permitted.) (excluding M.s. Or Tor Reinforcement) M-250 Item No 7:-providing And Fixing In Position Steel Bar Reinforcement Of Various Diameters For Rcc Piles, Caps, Footings, Foundations, Slabs, Beams, Columns, Canopies, Staircases. Newels, Chajjas, Lintels, Pardies, Copings, Fins, Arches, Etc.as Per Detailed Designs, Drawings And Schedules; Including Cutting, Bending, Hooking Thebars,binding With Wires Or Tack Welding And Supporting As Required,etc. Complete (including Cost Of Binding Wire) Is 1786, (bd-f-17/306) Item No.8- Supplying, Filling, Spreading & Leveling Stone Boulders Of Size Range 5cm To 20cm In Recharge Pit, In The Required Thickness, For All Leads & Lifts, All Complete As Per The Direction Of Engineer In-charge Item No 9:- Supplying, Filling, Spreading & Leveling Gravels Of Size Range 5mm To 10mm, In The Recharge Pit, Over The Existing Layer Of Boulders, In Required Thickness, For All Leads & Lifts, All Complete As Per Direction Of Engineer Incharge For Root Zone Treatment -item No1:- Excavation For Foundation / Pipe Trenches In Earth ,soils Of All Types Sand, Gravel & Soft Murum Including Removing The Excavated Material Upto A Distance Of 50 M & Lift As Below Stacking And Sprading As Directed Dewatering Shoring & Struting Preparing The Bed For The Foundation &neccesary Back Filling Etc Item No 2:- Excavation For Foundation / Pipe Trenches In Hard Murum Including Removing The Excavated Material Upto A Do\istance Of 50 M & Lift As Below Stacking And Sprading As Directed Dewatering Shoring & Struting Preparing The Bed For The Foundation & Neccesary Back Filling Etc Item No 3:- Excavation For Foundation / Pipe Trenches In Hard Murum Boulders Including Removing The Excavated Material Upto A Do\istance Of 50 M & Lift As Below Stacking And Sprading As Directed Dewatering Shoring & Struting Preparing The Bed For The Foundation & Neccesary Back Filling Etc Item No 4 :-excavation For Foundation / Pipe Trenches In Soft Rock And Old Cement And Lime Masonry Foundation Asphalt Road Including Removing The Excavated Material Upto A Distance Of 50 M & Lift As Below Stacking And Sprading As Directed Dewatering Shoring & Struting Preparing The Bed For The Foundation & Neccesary Back Filling Etc Item No. 5- Providing And Laying In Situ Cement Concrete M-15 Of Trap/ Granite / Quartzite / Gneiss Metal For Foundation And Bedding Including Bailing Out Water,form Work, Compaction, Curing, Etc.complete (cement 5.90 Bags /cum) Spec. No. - Bd E /1 Page No. 287 And B- 7, Page No. 38 A) In Pcc M-150 Item No. 6-providing And Casting In Situ C.c. Of Trap / Granite/ Quartzite / Gneiss Metal Of Approved Quality For Rcc Works As Per Detailed Drawings And Designs Or As Directed By Engineer-in-charge Including Normal Dewatering, Centering, Form Work, Compaction, Finishing The Formed Surfaces With C.m. 1:3 Of Sufficient Minimum Thickness To Give A Smooth And Even Surface Wherever Necessary Or Roughening If Special Finish Is To Be Provided And Curing, Etc. Complete. (by Weigh Batching And Mix Design For M-250 And M- 300 Only. Use Of L&t, A.c.c., Ambuja, Birla Gold, Manikgad, Rajashree, Etc. Cement Is Permitted.) (excluding M.s. Or Tor Reinforcement) M-250 Item No.7- Providing And Fixing In Position Steel Bar Reinforcement Of Various Diameters For Rcc Piles, Caps, Footings, Foundations,slabs, Beams, Columns, Canopies, Staircases, Newels, Chajjas, Lintels, Pardies, Copings, Fins, Arches,etc. As Per Detailed Designs, Drawings And Schedules; Including Cutting, Bending, Hooking The Bars, Binding With Wires Or Tack Welding And Supporting As Required, Etc. Complete (including Cost Of Binding Wire). (bd-f 17/306) Tor Steel Item No.8- Supplying, Filling, Spreading & Leveling Stone Boulders Of Size Range 5cm To 20cm In Recharge Pit, In The Required Thickness, For All Leads & Lifts, All Complete As Per The Direction Of Engineer In-charge Item No 9:- Supplying, Filling, Spreading & Leveling Gravels Of Size Range 5mm To 10mm, In The Recharge Pit, Over The Existing Layer Of Boulders, In Required Thickness, For All Leads & Lifts, All Complete As Per Direction Of Engineer Incharge
Gem Bids For Stone Aggregate 12-20 Mm, Stone Aggregate 40 Mm, Stone Aggregate 63 Mm, Sand, Rr Stone, Quick Settingcompound, Brick Bats Oblique Stone Agg 40 To 63 Mm, Lime, Bitumen, White Cement, Pcc Block 400x200x200, Bitumen Filler Board 8 Feet By 4 Feet, Black Granite 2 Mtr By0.5 Mtr, Non Skid Coloured Cramic Tile 600mm X 600mm, Binding Wire 25 Mm Dia
Repair And Maintenance Of Infrastructure Assets In Cp Division During 2025-26. Sub Head Repair Of Footpath Parking Toe Wall Granite Cobol Stone And Allied Civil Works At Inner Circle Block Side And Parking Area At Connaught Place.
Gem Bids For Custom Bid For Services - Lapping To Grade 0 Levelling Andcalibration Of An Assembly Of 8 Nos Of Granite Surface Plateseach Of Size 2600 Mm By 1500 Mm
Gem Bids For Construction Of Granite Work
Forward Bidding For Sale Of Dimensional Black Granite Blocks From Mahimandalam Portion-B Quarry Of Tamin Sale Of Dimensional Black Granite Blocks From Mahimandalam Portion-B Quarry Of Tamin
Forward Bidding For Sale Of Dimensional Black Granite Blocks From Kaveripuram 3P Quarry Of Tamin Sale Of Dimensional Black Granite Blocks From Kaveripuram 3P Quarry Of Tamin
Forward Bidding For Sale Of Dimensional Black Granite Blocks From Yellikaradu Bit Ii Top, Middle And Bottom Pits Quarry Of Tamin Sale Of Dimensional Black Granite Blocks From Yellikaradu Bit Ii Top, Middle And Bottom Pits Quarry Of Tamin
Forward Bidding For Sale Of Dimensional Black Granite Blocks From Kodakkal 1193/1 Ext. 24.30.0 Ha Portion Ii Quarry Of Tamin Sale Of Dimensional Black Granite Blocks From Kodakkal 1193/1 Ext. 24.30.0 Ha Portion Ii Quarry Of Tamin
Forward Bidding For Sale Of Dimensional Black Granite Blocks From Mahimandalam Portion-C Quarry Of Tamin Sale Of Dimensional Black Granite Blocks From Mahimandalam Portion-C Quarry Of Tamin