Patan Swd Under Sjmmsvy Reinvitation : Designing And Constructing An Integrated Storm Drainage System Including Providing, Supplying, Lowering Laying, Jointing, Testing And Commissioning Gravity Mains And Rising Main Pipeline, Construction Of New Pump House, Supplying, Erecting, Testing And Commissioning Of Pumping Machineries, Road Restoration, Electro-mechanical Work Etc. Including 03-three Years Defect Liability Period For Patan Nagarpalika Strom Water Drainage Project, Tal: - Patan, Dist.: Patan, Gujarat Under Sjmmsvy
Designing And Construction Of Sewage Treatment Plant Of 18.00 Mld And Upgradation Of 13.50 Mld Stp Along With Working Survey, Soil Investigation, Design Of Underground Drainage Project Work Including Providing, Supplying, Lowering Laying, Jointing, Testing & Commissioning Of Sewer Collecting System - Gravity Mains And Rising Main Pipeline, Construction And Renovation Of Sewage Pumping Station Sps, Supplying, Erecting, Testing And Commissioning Of Pumping Machineries Etc. With Operation And Maintenance For 02-two Years For Ugd Network And 07-seven Years For Stp Including 03-three Years Defect Liability Period For Dholka Nagarpalika Underground Drainage Project - 4.2, Taluka: - Dholka, Dist.: Ahmedabad, Gujarat Under Sjmmsvy
Sh Operation And Maintenance Of Intake Structure Wtps, Pump Houses At Old Manali Old New, Sector Storage Tanks, Other Civil Works, Raw Water Gravity Main, Sector Gravity Mains, Entire Distribution System, Entire Firefighting Network I.e Hydrant Etc
Waghodia Ugd Ii Under Sjmmsvy: Working Survey, Soil Investigation, Design Of Underground Drainage Project. Work Including Providing, Supplying, Lowering, Laying, Jointing, Testing And Commissioning Of Rcc Np3 Pipes For Sewer Collecting System - Gravity Mains And Di Pipes For Rising Main Pipeline, Construction Of Sewage Pumping Station Sps, Construction Of Sewage Treatment Plant, Supplying, Erecting, Testing & Commissioning Of Pumping Machineries At Zone Level, Construction Of Inspection Chambers & House Connection, Rcc Road, Compound Wall, Electrification Work And Sewer Cleaning Equipment Etc. For Underground Sewerage System For Waghodia Town Project, Work Including Operation And Maintenance Of 2 Years For Sewer Collecting System, And 7 Years For Sewage Treatment Plant
Sh Operation And Maintenance Of Intake Structure Wtps, Pump Houses At Old Manali Old New, Sector Storage Tanks, Other Civil Works, Raw Water Gravity Main, Sector Gravity Mains, Entire Distribution System, Entire Firefighting Network Etc. To 5 Years Ar And Mo Wss
Sh Operation And Maintenance Of Intake Structure Wtps, Pump Houses At Old Manali Old And New, Sector Storage Tanks, Other Civil Works, Raw Water Gravity Main, Sector Gravity Mains, Entire Distribution System, Entire Firefighting Network For 5 Year Ar And Mo Wss Manali
Wadi Shewadi Medium Project Tal Shindkheda Dist Dhule Pipe Distribution Networks System For Gravity Main And Sub Mains Of Dm No 02 Dm No 09 And Tail Dy On Right Bank Canal At Ch6765 M 18115 M 18375 M Including Operation And Maintenance Of An Enti
Rectification Of Leakages For Pumping Mains And Gravity Mains From Lingampalli To Elsrs In Kadapa Municipal Corporation General Funds
Sh Operation And Maintenance Of Intake Structure Wtps, Pump Houses At Old Manali Old And New, Sector Storage Tanks, Other Civil Works, Raw Water Gravity Main, Sector Gravity Mains, Entire Distribution System, Entire Firefighting Network. Ar And Mo Wss Manali Town In Tehsil Manali Distt. Kullu H.p.
Construction Of Lift Irrigation Scheme Beet Area Phase-ll In Tehsil Haroli District Una (hp). Schedule-1: C/o Pump Houses, Collection Tank, Sector Tanks, Main Delivery Tanks, Outlets, Providing And Laying Gmserw Pipes For Rising Mains, Gravity Mains, Providing And Laying Hdpe Pipes For Distribution System And Supply & Errection Of Submersible Pump Sets And Centrifugal Pump Sets With Fully Automation (upto Cammand Area) Including Trial Run Period Of Six (6) Months After Physical Completion Of All Components And Successful Commissioning Of The Scheme And Thereafter Schedule-2: Operation And Maintenance For Three Years)