To Carry Out Work Required For Dismantling Of The Existing All Electrical Parts, Cables, Panels, Supporting Parts Etc Complete From Pumphouse Floor And Handing Over To The Site By Means Of Labour, W/S Charges, Sundry Charges, Handling, Cutting Tools Tno16.1Of2025.26
To Carry Out Work Required For Dismantling Of The Existing All Electrical Parts. Cables. Panels. Supporting Parts Etc Complete From Pumphouse Floor And Handing Over To The Site By Means Of Labour W/S Charges, Sundry Charges Handling Cutting Tools And Tno16.3Of2025.26
To Carry Out Work Required For Dismantling Of The Existing All Electrical Parts, Cables, Panels, Supporting Parts Etc Complete From Pumphouse Floor And Handing Over To The Site By Means Of Labour, W/S Charges, Sundry Charges, Handling, Cutting Tools Tno16.2Of2025.26
Gem Bids For 1 Runner Handling Tools
Gem Bids For 2 Production Consumables Of R-ii Production Handling Tools Of R-ii
Gem Bids For 1 Runner Handling Tools For Chamera-iii Power Station Make & Model: Ge
Gem Bids For 1 Process Equipment Design Module Management And Safe Handling Tools With Accessories
Supply Of Mud Line Suspension 20" (for 10m Mlss) , Mud Line Suspension 13-3/8" (for 10m Mlss) , 9-5/8" Mud Line Suspension (for 10m Mlss) , Running Tool For 20" Mud Line Suspension , Running Tool For 13 3/8" Mud Line Suspension , Running Tool For 9 5/8" Mud Line Suspension , Corrosion Cap/ Ta Cap For 20” , 13 3/8“ And 9 5/8“ Mls , Running And Retrieving Tool For 20” , 13 3/8“ , And 9 5/8 , Spares/ Redress Kits For Handling Tools , Casing Hanger Set 15m 20" X13-3/8" X9-5/8
Providing Necessary Assistance For Attending Running And Maintenance Of Machineries Inspection Vehicle Floating Crafts Cargo Handling Equipment Other Tools And Plants At Kavaratti For The Year 2024-2025
Supply of Sucker Rod Handling Tools, 67 Sucker Rod Hook-99109123 Wrenches-99075096 Wrenches-99075095 Sucker Rod Elevator-99075094 Sucker Rod Elevator-99075093 Polish Rod Clamps- 99097612 Sucker Rod Elevator-99086482