Construction Work Of Government M.s.j. College Ground Water Harvesting Structure.
Renovation And Re- Excavation Of Water Harvesting Structure Wht From Kantakhali Sluice To Tentultala Math Via Hirapur And Via Abdul Seikh House To Sasmal Para Burning Ghat At Hirapur Mouza Under Block- Uluberia -I In The District Of Howrah Wbwrdd/Eeam/Hwh/Enit 38/25-26
Construction Of Rain Water Harvesting Structure For Grey Water Management Near Lions Club In Ward No-14
Construction Of Water Harvesting Structure Under Pm Shri Scheme At West Santinagar High School Of Kalyanpur R.d Block As Per Pwd Sor 2023.
Construction Of Water Harvesting Structure Under Pm Shri Scheme At Moharcherra High School Of Teliamura R.d Block As Per Pwd Sor 2023.
Construction Of Water Harvesting Structure Under Pm Shri Scheme At Tuimadhu High School Of Mungiakami R.d Block As Per Pwd Sor 2023.
Construction Of Water Harvesting Structure- Mini Check Dam In Survey No. 84/17 At Bandoli, Kirlapal, Dabal, Dharbandora Goa
Desilting And Deepening Of Water Harvesting Structure- Farm Pond In Survey No. 20/4 Haluli, Camarconda, Kirlapal Dabal, Dharbandora Goa
Construction Of Dead Well/tube Well Recharge And Roof Top Water Harvesting Structure In Gp Maharajpura, Shreema, Shivsinghpura, Takabgaon, And Shri Rampura In Pmksy 2.0 Area In Block Lalsot District Dausa
Rainwater Harvesting For Pts Earthen Structure, Pump House, And Desilting Basin.