Day To Day Maintenance Of Arboriculture Works Of Zone-Iii Algoria Zone-Vi Beraberia Head Work Sites Each Approx Area 0.33 Acre Within The Jurisdiction Of North 24-Pgs. Arsenic Area W/S Scheme Under North 24 Pgs. W/S Division-I, P.H.E. Dte. F Wbphed/8E/Ee/Nwsd-I/25-26Sl.6
Maintenance Of Arboriculture Works Of Zone-Ia Suryapur, Zone-Ib Telenipara Zone-Ii Berunanpukuria Head Work Sites Each Approx Area 0.33 Acre Within The Jurisdiction Of North 24-Pgs. Arsenic Area W/S Scheme Under North 24 Pgs. W/S Division-I Wbphed/8E/Ee/Nwsd-I/25-26Sl.9
Under The District Plan Head Construction Work Of Health Departments Sub Centre Jagdhar Chamba In Jagdhar Of Development Block Chamba
Construction Of Internal Cement Concrete Road At Malkapur Gp- Dharur Ramapur Head Of Work- Thakkar Bappa Adiwasi Vasti Sudhar Yojana 24-25 Construction Of Internal Cement Concrete Road At Malkapur
Supply And Erection On Semi Turnkey Basis Construction Work Of Over Head Lt Line 95 Sqmm Cable At Vill- Omkareshwar Circle Khandwa For Simhastha-2028
Providing Security Guard At Head Work Esr Wtp And Billing Centre At Ballarpur Wss M And R To Ballarpur Water Supply Scheme Ta Ballarpur
Renovation And Repair Of 350 Cum Capacity Existing Rcc Elevated Ohr With Staging Height 20m Along With Pipe Connection Around Head Work And Land Development And Repair Renovation And Construction Of Rc Framed Masonry Boundary Wall Approach Road Etc
Deployment Of Un-Armed Security Guard With Uniform And Other Charges, For 1 Kurulia H/W Site Under Boyra W/S Scheme, 2 Sripally Store For Bongaon Block 3 Palla Store For Palla W/S Scheme, 4 Paikpara Head Work Site Store For Paikpara W/S Schem Wbphed/9E/Ee/Nwsd-1/25-26Sl6
Maintenance Of Arboriculture Works Of Zone-Iv Tentulia Zone-V Kharki Head Work Sites Within The Jurisdiction Of North 24-Pgs. Arsenic Area W/S Scheme Under North 24 Pgs. W/S Division-I, P.H.E.Dte. For 365 Days. Wbphed/8E/Ee/Nwsd-I/25-26Sl.8
Desilting Of Barrel And Supply Channel Of New Partap Canal Head Work.