Part-b Offsite Pipeline And Inlet Receiving Tank Projects Of Mangalore Refinery And Petrochemicals Ltd., Mangaluru, Karnataka Carrying Out Tankages Works Including Piping, Insulation, Painting, Stress Relieving, Hot Tapping, Floating Oil Skimmer System, Electrical, Heat Tracing System On Sub Contract Basis In Connection Tankages And Mechanical Works Continue
Replacement Of Insulation In The Hot Air Branch Ducts Of Coal Mil
Replacement Of Insulation In The Hot Air Branch Ducts Of Coal Mill Efgh
Mtps I Mill Plant Unit Iv Removal Of Accumulated Ash From The Horizontal Portions Of The Mill Inlet Hot Air Ducts At 45Mtr Level 18Mtr Level And Providing Insulation For Pa Inlet Hot Air Duct To Mill For Mills 4A To 4F During Overhaul 2025
Ttps Mech Ii Bm Unit V Removal And Relaying Of Insulation With Cladding On Hot Primary Air Duct Hot Secondary Air Ducts And Airpreheater Outlet To Chimney Duct Areas Of Unit V For The Year 2025 2026
Tender For Hot Insulation Boiler / Main Steam Line
Hot And Cold Insulation Works In Pp, Meg And Other Units At Paradip Refinery And Petrochemical Complex
Rate Contract For Replacement Of Chilled Water Pipe, Hot Water Pipe And Insulation Work On Hvac Gss Sheet Metal Ducting, Pipe Etc.
Gem bids for Repair, Maintenance, And Installation Of Plant/Systems/Equipments Version 2 - Industry Unit; Removaland Application Of Hot Insulation Along Withscaffolding Of Boiler In Sgp At Rcf Thal; Serviceprovider /
Ttps Operation Circle Mpm I Unit Iii Removal Of All The Damaged Insulation In The Hot Primary Air Ducts From Air Preheaters To Mills And Insulating The Ducts With Lrb Wool Mattresses And Cladding With G.I Sheet Of 0.63Mm Thickness And Removal Of Ash