Madar-karjoda:-ctr (p) With 60 Kg Rail On Passenger Running Loop Line-6.607 Kms In Jurisdiction Of Aden/l/aii.
Improvement Of Water Supply By Replacement Of Old And Damaged Water Line And Providing Loop Line At Khajoor Road Gali No. 26L, 26K, 26M In Molarband Ward Ward No. 181 In Badarpur Constituency Ac-53 Under Ee C -31 N.I.T. No. 20 2025-26 Item No. 2
S&t Work In C/w Ctr(p) 0.65km Up Loop Line Of Existing Track Laid With 52 Kg Rails On Psc-5 Sleepers With M+7 Density With Proposed 60kg 90uts New Rails On Psc-6 Sleepers With M+8 Density At Beas On Juc-asr Section Under Den-iii/fzr.
Welding Of Rail At Site With Mobile Flash Butt Welding Plant In The Section Of Aden/bti & Aden/pta In C/w Trr (s) Of 25.396 & Ctr(s) Of 24.585tkm In The Section Of Sr.den-ii.umb And Conversion Of Loop Line From Swr To Lwr With Mfbwp In The Section Of Sr.den-ii & Iii.
25 Kv Ohe Modification Work In Connection With Proposed 01 Loop Line On Guna Line At Sithauli-a Cabin Station Of Jhansi Division.
Bagalkot-kudachi New Bg Line Project: Proposed Construction Of Staff Quarters, Tm Rest House, Labour And Merchant Rooms, Platforms, Subway, Fob, Pf Shelter, Drainage, Extension Of Rub, Laying And Linking Of One Loop Line And Other Miscellaneous Works At Sulikeri, Khajjidoni And Lokapur Stations.(composite Work)
Signalling Work In Connection With "construction Of Additional Loop Line With Standard Layout Of B Class At Jayasingpur And Rukadi Station".
1. Barlai - Additional Common Loop Line At In Connection Of Simhastha 2028. 2. Pingleshwar - Emergency X-over In Connection Of Simhasth-2028. 3. Tajpur - Additional Loop Line At In Connection Of Simhastha 2028. 4. Naikheri - Yard Remodeling With Additional Loop And Stabling Line In Connection Of Simhastha 2028.
Pdpk-yard Modification For Provision Of One Additional Loop Line Beside Line No. 10 And Conversion Of Dead End Line No. 10 Into Loop Line With Both Side Entry And Exit Facility And Also Conversion Of 1 In 8.5 Cross-over Into 1 In 12 At Both End Of L.no.-6 For Coaching Fit (conversion Of 1 In 8.5 Cross-over Into 1 In 12 At Both End Of Line No.6 Of Pdpk Yard, Provision Of One Additional Loop Line Beside Line No.10 And Conversion Of Line No.10 Into Full Length Loop Line With Both Side Entry And Exit Facility At Pdpk Yard And Provision Of At).
Electrical/trd For The Work Of Bhogpur (bop) - Increasing Of Csl Of The Up Main And Common Loop Line Of Bop Station.