Repairing Of Neutralizing Pit No.1 And 2 With Acid Or Alkali Resisting Tiles And Other Ancillary Jobs
Repairing Of Neutralizing Pit Pump East By Replacing Of Wornout Spares In Dm Plant I
Repairing Of Neutralizing Pit Pump East By Replacing Of Wornout Spares In Dm Plant I
Repair Works To The Damaged Rcc Drain For Carrying The Effluent Water From Chemical Lab To Neutralizing Pit At Dm Plant Of Nctps I
Repair Works To The Damaged Neutralizing Pit B And The Inlet Drains By Laying Of Frp Fiber Reinforced Plastic Lining Over The Concrete Surface Of The Neutralizing Pit For Collection Of Effluent Water From Dm Plant