Ccg-vr Section: - Desilting Of Central / Side Drains, Manholes Etc., With Hiring Of Jcb , Pavement Breaker And Pocklain Machine Under Sse (p. Way) Bvi & Byr Section From 2025 To 2026 For 2 Years.
Providing And Applying Lane Marking Paint, Fixing Pavement Marker At Speed Breaker, Zebra Crossing In Beat No. 199 In G/South Ward.
Construction Of Control Room Building, Boundary Wall, Cable Trench, Transformer Plinth, Earth Filling, Load Breaker Switch, Concrete Pavement And 2 Nos. Gates With All Other Allied Items For 33 Kv Switching Sub Station In Sec75, Fbd Hew 30
Desilting Of Central / Side Drains, Manholes Etc., With Hiring Of Jcb, Pavement Breaker And Pocklain Machine Under Sse P. Way Ddr & Adh Section From 2024 To 2026 For 3 Years.
Desilting Of Central / Side Drains, Manholes Etc., With Hiring Of Jcb, Pavement Breaker And Pocklain Machine Under Sse P. Way Bvi & Byr Section From 2024 To 2026 For 3 Years.