Renovation Of Damaged Pile Cap And Providing The Ci And Di Pipe For Thiruparkadal Foot Bridge Pumping Station At Thiruparkadal In Kancheepuram Corporation
Provision Of Rcc Box Of Size 1.0m X 1.2m In Lieu Of Pipe Bridge At Km 243.506 In Lunkaransar Yard Over Bikaner Division Under Jurisdication Of Aden/line/bikaner.
For Relaying Of Existing Line Near Kanjiram Bridge For Pwd Drain Work. Estimate Is Prepared As Per The Direction And Joint Visit With Pwd Officials. Deposit-Providing And Laying New 90Mm Hdpe Pipe-Near Kanjiram Bridge
Gem Bids For Hyd Pipe Repaired , Nut Thread Worn Out Repaired , Motor Rewinding , Pressure Pipe Repaired , Bridge Block Lock Repaired
Replacement Of Existing Hume Pipe Bridge (total No-29 Nos) By Rcc Box Bridge In Phephna-aunrihar Section & Protection Of Bridge No-16 At Km 17/2-18/6 Between Manjhi - Bakulha Station.
Construction Of Boundary Wall On The Left Bank Of Tehkhand Drain Between Rd 340m Pipe Line Bridge To Rd1150m Pipe Culvert
Laying Of Bt Road From Old Culvert Near Akkammagari Temple To Railway Over Bridge And Consuction Of Pipe Culvert In Place Of Old Damaged Culvert At Konapuramu Road, Penukonda Nagara Panchayath
Construction Of Rcc Road Along With Hume Pipe Culvert Near Weigh Bridgeand Rcc Paving Around Weigh Bridge Of Pb-nw Cmp. Construction Of Rcc Road Along With Hume Pipe Culvert Near Weigh Bridge
A) (a)kyn - Kjt:-replacement Of Old Stone Top/rail Top Bridges 59/3, 60/1, 63/3, 63/6, 64/1, 64/2, 65/2, 65/3, 65/3a, 66/3, 66/5 By Rcc Box/pipe To Match Bridge Configuration With Mrvc New Bridge Work Of 3rd & 4th Line In Kyn-kjt Section. (b)closure Of Existing Old Bridges 58/2, 62/4, 63/4, 66/2, 66/5, 67/1, 67/5 After Construction Of Bridges By Mrvc In Kyn-kjt Section Under Aden/t/kyn Section. B)augmentation Of 83/2, 86/3, 88/6, 90/3 Water Way Bridges By Replacing Small Stone Top Bridges To Avoid Flooding In Kyn-kjt Section. (project Id No. 01.02.32.24.3.51.010) C) (a) Kyn-kjt:- Rehabilitation Of Arch Bridges By Jacketing Of Br. No. 65/2, 69/5, 72/4, 73/1 And 74/2. (b) Protection Of Embankment Of Br. No. 70/3 (raw) To Barrage By Provision Of Retaining Wall/ Gabion On Both Up And Dn Side. D) Kalyan- Karjat :- Jacketing And Increasing Barrel Length Of Br. No.51/3, 52/4, 75/1, 76/1,77/1,77/2, 78/1 In Kyn -kjt Section Under Aden T Kyn.
Sh Providing And Fixing Monoblock Pump Of 10bhp With Allied Accessories And Crossing Of Hdpe Pipe Through Gantry Bridge Restoration Of Rain Damages Lis Shamshi Phase Ist In Tehsil Bhuntar