Annual Maintenance Of Pipe Lines Lekeages For The Financial Year 2025-26 In Ibrahimpatnam Municipality Under Mgf
This Work Is For Providing A Total Number Of 50 New Fhtcs, Providing Distribution Pipe Lines, Valves, Valve Chambers Etc Including Restoration Of Roads After Pipe Laying Jal Jeevan Mission Package 7B Full Coverage To Chairagadu St Colony In Urangattiri Gramapanchayath, Malappuram District
This Work Is For Providing A Total Number Of 50 New Fhtcs, Providing Distribution Pipe Lines, Valves, Valve Chambers Etc Including Restoration Of Roads After Pipe Laying Jal Jeevan Mission Full Coverage To Package 5 Karimbu St Colony In Urangattiri Gramapanchayath Malappuram District
Provision Of Flocculation Tank & Sedimentation Tank In Filter House And Intake Well At Pampu Talab Including Pipe Lines At Gjd Under Aden/gjd.
Work For Rectification Of Psc And Ms Pipe Lines From Size 1500 Mm Dia To 457 Mm Dia And Air Values Of Waghur Water Supply Scheme
Shifting Of Existing Gi Pipe Lines By Laying Jointing And Testing Of Gi Pipes 150Mm 125Mm 100Mm 65Mm 50Mm And 32Mm Dia Damaged Due To C/O Culvert Near Chhipnu Tank And C/O Pillars A/R And M/O Water Supply Scheme For Mandi Town From Uhl River In Distt Mandi Hp
Repair/maintenance Of Cooling/heating Appliances Such As Split/window Ac Water Cooler Desert Cooler At Af Station Rajokri And Repair/maintenance Of External Water Supply Systems Pipe Lines Pumps Oh Tanks Ug Sump At Af Stn Rajokri
Imp. And Upgradation Of Water Supply Pipe Lines From Pump House Behind Ward No.8 To Various Wards 2, 3 And 4 And 5 Etc. In Mvid Hospital.
Imp. And Upgradation Of Water Supply Pipe Lines From Pump House Behind Ward No.8 To Various Wards 2, 3 And 4 And 5 Etc. In Mvid Hospital.
Annual Plan-Devikulam Gp 2025-2026- Ward 4 -Chittivara Oc Division Main Water Tank To Lines Pipe Line Project 31/26-Pipe Line Work-General Civil Work