Cleaning The Roof Tops Of Various Buildings Such As Power House, Ash Handling, Boiler, Bunker Esp 4 And 5 Control Room Cwph 2 Of Unit 4 And 5 At El 3.00M To 52.80 M And Clearing Away The Deposits To Far Off Places For The Period From 01.04.202
Annual Contract For Regular Cleaning Of Power House Area Boiler, Turbine And Auxiliary Equipment, Including Optional Job Of U-1 To U-5 Of Bktps For Two Years.
Ht And Lt Works For Upgradation Of Substations For Boiler House And Diesel Power House
Laying Of The Fire Water Lines Along Mill Workshop Near Unit 2 Boiler Of Meja Thermal Power Project
Esp Cleaning By Water Washing In Power Boiler # 1 To 7 At Energy Dept.
Overhauling Of Ash Extractor In Power Boiler#1, 2 And 3 At Energy Mechanical
Gem Bids For Repair And Overhauling Service - Replacement Of Existingcorroded Seal Trough & Hopper Plate And Erection Of Newseal Trough & Cladded Hopper Plate Along With The Supply Ofmaterial; 500 Mw Thermal Power Station - Boiler; Yes; Buyerpremises
Replacement Of Coal Feeder Trough, Chain, Trough Plates Lines Etc In Power Boiler#1, 2 And 3 At Energy Mechanical
Intercarting Of Wet Fly Ash Generated In Power Boiler 4, 5, 6.And 7 To Lsfm At Energy Process
Major Overhauling Of Pith Slot Conveyor In Power Boiler # 6 In Energy Mechanical At Tnpl Unit - 1.