Design, Engineering, Supply, Erection And Commissioning Of Prefab Building Structure/s For Iti In Maharashtra State At Consignee Locations
Construction Of Prefab Structure For Uhwc At Balliguda For The Year 2025-26.
Expansion And Modification Of Fruit And Vegetable Processing Unit At Nimoo Construction Of Prefab Structure Leh To Be Added In The Existing Structure
Gem Bids For 6562 The Basic Construction Of Internal Ft Tr Covered Will Be Prefab Structure Made Of 49 Point 5x49 Point 5x3 Point 6 Mm Ms Square Hollow Section Shs And Trusses Columns Fabricated With 49 Point 5x49 Point 5x3 Point 6mm Ms Shs Of Medium Grade With Base Plate Welded With 200mmx200mmx5mm And Top Gusset Plat Of Size 200mmx200mmx5mm Truss Fabricated With Fabricated With 49 Point 5x49 Point 5x3 Point 6mm Ms Shs With Gusset Plat 2 Nos Of Size 200mmx200mmx5mm With Four Nos Holes For 12 Mm Dia Purlin Fabricated With 49 Point 5x49 Point 5x3 Point 6mm Ms Shs With Cleats Welded At Both End Of Size 100x50x5 Mm With Two Nos Holes Railing Fabricated With 49 Point 5x49 Point 5x3 Point 6mm Ms Shs With Cleats Welded At Both End Of Size 100x50x5 Mm With Two Nos Holes Stsd Screw Of Length Min 90mm Pre Painted Galvalume Plain Ridge Sheets 0 Point 50 Mm Thick Of Size 2400x600mm Pre Painted Galvalume Sheets 0 Point 50mm Thick Of Size 1200x1050 For Roof Covering Quick Setting Compound
Repair/renovation Of Govt. Quarter No. 20b By Way Of Prefab Structure At Gandhi Nagar Jammu. Cno720-np
Construction Of Prefab Structure Over Roof Of Old Gents Hostel Building In Scbmch, Cuttack For The Year 2024-25 For Multi Purpose Hall Such As Reading Room Cum Dormitory
Dismantling Of Prefab Structure From Tc-1, Shifting To Main Campus And Re-Erection At Brahmputra Hostel, Iit Ropar
Dismantling Of Prefab Structure From Tc-1, Shifting To Main Campus And Re-Erection
Construction Work Of Model Double Storey Prefab Structure G+1 Under Center Of Excellence At Industrial Training Institute, Muzaffarpur Lwe In Collaboration With Tata Technologies Under Seven Nishchay-2 Of The State Government. Construction Work Of Model Double Storey Prefab Structure G+1 Under Center Of Excellence At Industrial Training Institute
Expansion And Modification Of Fruit And Vegetable Processing Unit At Nimooconstruction Of Prefab Structure Existing Structure At Nimoo Leh To Be Added In The Existing Structureby Way Of Flower Work At Prefab Structure Centre Of Excellence At Nimoo