Slope Protection Measures For Slope Stabilization Work From Km 141/480 To Km 141/540 At Sangaldan Yard On Katra Dharam Section Of Udhampur Srinagar Baramulla Rail Link Project In Jammu & Kashmir
Engineering Procurement And Construction (epc) Of Major Bridge No. 04(3x18.30m Composite Girder), 11a(3x30.50m Composite Girder), 12(4x30.50m Composite Girder), 19(1x18.30m Composite Girder), 20(1x24.4m Composite Girder ) & 22(1x18.30m Composite Girder) With Substructure Of Double Line Track And Superstructure Of Single Line Track Including Its Approaches And Rob No. 1a(1x102.0m, Steel Open Web Girder), 1b(1x102.0m, Steel Open Web Girder) & 24(1x102.0m, Steel Open Web Girder) With Minor Bridge /sub Way No. 1c (1x6.0m Box), 1d (1x3.0m Box), 24a (1x6.0m Box), 25a (1x6.0m Box), 24b (1x6.0m Box) & 25b (1x6.0m Box) In Connection With Bikramshila-katareah New Line Rail Link Project
Slope Protection Measures For Slope Stabilization Work From Km 141/480 To Km 141/540 At Sangaldan Yard On Katra Dharam Section Of Udhampur Srinagar Baramulla Rail Link Project In Jammu & Kashmir.
General Providing Hand Rail At Chakkamkandam Palayur Link Road In Ward 11 Guruvayur Municipality General Civil Work
Fabrication, Hot Dip Galvanizing And Supply Of H-beam Steel Sleepers & Stool For Chenab Bridge On Katra - Dharam Section Of Udhampur Srinagar Baramulla Rail Link Project J&k.
Eoi Invited For Association As Subcon Partner From Exp. Agencies For Execution Of Earthwork In Form., Minor, Major Br., Yards, Stn Build. P Way, Ballast Supply, Platform... Bw Pallahara. Incl. All Yards In Talcher Bimalagarh New Bg Rail Link Project
Execution Of Earthwork In Formation, Minor Bridges, Major Bridges, Yards, Station Buildings, Service Buildings, P-Way Linking Work, Ballast Supply, Platform Work, Pf Shelter, Drain Work, Camping Facilities, Protection Works And Other Allied Works Between Pallaharaex Ch: 76.90 Km - Barkotein Ch: 98.325 Km Including All Yards In Connection With Talcher - Bimalagarh New Bg Rail Link Project
Insurance Of Passengers/public, Money, Fidelity, Assets, Properties And Trains Of Rapid Metro Rail Link Rmgl Portion - Consist Of 6 Stations And 1 Depot Namely - Sikanderpur, Dlf Phase 2, Belvedere Towers, Cyber City, Moulsari Avenue, Dlf Phase
Expression Of Interest For Subcontractor For Tunnel And Formation/structure Works Sidhi Singrauli New Rail Link Project
Earthwork, In Cutting/filling, Blanketing, Viaduct, Major Bridges, Minor Bridge, Robs, Rub, Protection Works And Other Allied Works Between Km 77.175 To Km 82.869 5.694 Km Within Punjab Area For Construction Of New Line From Kartoli Punjab To Talwara Block Section Of Nangal Dam - Talwara New B.g. Rail Link.