Athrough Rail Renewal P 14.56 Kms Work On Jhansi-Dhaulpur Section Under Sr.Den/North Jurisdiction. Bthrough Fastening Renewal, 53.98 Kms Work On Jhansi-Dhaulpur Section Under Sr.Den/North Jurisdiction.
Improvement Of Khakhrechi Yard & Rectification Of Bad Layout In Various Yards I.E. Chharodi, Viramgam, Jakhwada, Jhund, Jatpipli, Ambli Road And Casual Renewal Of Rail, Point & Crossing Sleeper & Cms Crossing And Other Ancillary Track Works Under Jurisdiction Of Senior Divisional Engineer West - Ahmedabad.
1 Through Rail Renewal Primary At Km 414.153 To 415.6 Dn, 415.753 To 416.5 Dn & 414.749-415.602 Up In Between Tkx-Rjb Section Total-3.047 Tr. Km, At Km 321.4 To 323.0 Sl, 317.8 To 318.8 Sl Tr. Km In Between Sbw-Tle Section Total-2.6 Tr. Km, At Km 383.07 To 384.67Up, 384.77 To 386.37Up, 381.47 To 382.97 Up, 379.77 To 381.37 Up, 378.07 To 379.67Up In Ksx-Bksc Section Total-7.9 Tr. Km 2Removal Of 784 Nos Dummy Glued Joint At Yard Between Bksc-Tkx, Ada-Gmo, Mdn-Vsu, Adra-Asn, Prr-Cni, Ksx-Bksc, Ada-Gmo Jc And Ada-Bqa Section In Adra Division
Replacement Of Wooden Sleepers And Shallow Screening Of Bhakra Rail Track Casual Renewal Work
Elect Trd-ohe Works In Connection With Through Sleeper Renewal Primary Tsrp, Complete Track Renewal Secondary Ctrs, Through Rail Renewal Primary Trrp, Through Rail Renewal Secondary Trrs, Complete Track Renewal Primary Ctr P In Different Sections Under The Adee/trd/tata Jurisdiction In Ckp Division.
Through Rail Renewal Primary With 60 Kg Rail On Passenger Running Loop Line Of 15.964 Kms In Ratangarh- Sadulpur Section Under Aden/Ratangarh
Open E-Tender For The Work Of Different Type Of Track Activity Like Casual Renewal Of Rail-Sleeper-Switch-Sej, Tamping Of Track, Deep Screening, Casual Renewal Of Fittings, Assisting Track Machine Etc. With Other Ancillary Work And Cleaning Of Drainage System Of Jamalpur-Keul Ex. Double Line Km 356/315-402/545 Up & Dn/L In The Section Of Sr. Section Engineer/P. Way-Ii/Jamalpur Under Assistant Engineer/L/Jamalpur In The Jurisdiction Of Sr. Divisional Engineer-Iii/E. Railway/ Malda.
Execution Of Different Pway Works Under The Jurisdiction Of Sr.Den/East/Wat In Connection With 1. Palasa - Vizianagaram - Donkinavalasa - Renewal Of 60Kg Glued Joints- 200 Nos. 2. Palasa - Vizianagaram - Donkinavalasa -Through Turnout Renewal-Through Fittings Renewal - 200 Sets. 3. Palasa - Korukonda - Donkinavalasa & Nwp-Gnpr Renewal Of 60Kg Cms Xings - 50 Sets 1 In 8.5 - 10 Sets & 1 In 12 - 40 Sets. 4. Vizianagaram - Korukonda 3Rd Line - Through Rail Renewal Primary - 8.260 Tkm 5. Through Fitting Renewal 90.2 Trkm 1660 Density & 17.226 Trkm 1540 Density Along With Tfrgrsp - 9.499 Trkm 1660 Density & 8.221 Trkm 1540 Density.
Various P.way Works Such As Casual Sleeper Renewal, Rail Renewal, Lifting & Packing Of Psc Sleepers, Distressing, Cut Rail Welding, Boxing Of Ballast, Cleaning Of Jungle, Shifting Of Materials From Section Etc. And Other Enabling Works In Sse/p.way/jjkr Unit Under The Jurisdiction Of Aden/jjkr Of Khurda Road Division.
I-Ms-Vm Section- Tsrp-11.755 Km - Through Sleeper Renewalp Of Existing 60Kg Sleepers With 60Kg /Psc/1660 Nos/Km Between Km. 29.52 To Km. 41.275 On Main Up Line Ii-Ms-Vm Section - Trrp- 1.472 Km With 60 Kg Rails/Lwr At Ms From Km.0.00 To Km 0.772 On Road No.8 Loop Line & From Km.0.00 To Km 0.70 On Road No.9 Loop Lineiii-Ms-Vm Section -Renewal Of Guard Rails And Guard Rail Sleepers Over Bridges And On Bridge Approaches In Various Pway Sections In Adem/Tbm Section.I Renewal Of Guard Rails Over Bridges- From Km. 1.028 To Km. 41.204 All Line Bridge No- 5A Main, 5A Up, 5A Dn, 35 A/L, 35 B/L, 35 Dn, 35 Up, 53 A/L, 53 B/L, 53 Dn, 53 Up, 116 Dn, 116 Up, 116A, 124 Dn, 124 Upii Renewal Of Guard Rails Flared Portion On Approaches Of Bridges- From Km. 1.028 To Km. 41.024 All Line Bridge No- 5A Main, 5A Up, 5A Dn, 35 A/L, 35 B/L, 35 Dn, 35 Up, 53 A/L, 53 B/L, 53 Dn, 53 Up, 116 Dn, 116 Up, 116A, 124 Dn, 124 Up.Iii Renewal Of Guard Rail Wider Sleeper 60 Kgiv Renewal Of Guard Rail Approach Sleepers