I Construction Of The Railway Portion Of The Road Over Bridge Rob At Railway Km. 499/7-9 In Lieu Of Lc. No.-233 At Km 498/47-499/1 Between Kalupara Ghat- Kuhuri Stations On Hwh-Mas Main Line Ii Construction Of The Railway Portion Of The Road Over Bridge Rob At Railway Km 610/19-21 In Lieu Of Lc. No.-319 At Km 610/17-19 Between Brahmapur-Golanthra Stations On Hwh-Mas Main Line Iii Execution Of Various Preliminary Activities Including Survey, Geo-Technical Studies, Preparation Of Gad Plans, Submission Of Final Report Etc. In Connection With Construction Of 12 Nos Robs Along With Provision Of Stair Case And Lhs/Light Fob In Lieu Of Closing Of Manned Lc No-204, 207, 212, 213, 216, 221, 223, 267, 270, 273, 321 & 324 Over Kur-Psa Main Line Under Khurda Road Division.
Development Of Sports Facilities And Beautification Work Under Sachin Railway Over Bridge Towards Talangpur Side In South Zone-b
Laying Of Interlocking Tiles Footpath From Railway Over Bridge Crossing Pappi Market To Kairon Road Traffic Lights
Extension Of Pipeline At Ward No.9 Bagathsingh Busstand To Railway Bridge In Vadakku Valliyur Town Panchayat. General Fund 2025-2026 - Ward 9 Extension Of Pipeline - Vadakku Valliyur Town Panchayat
Relocating The 350Mm Di Pumping Main Pipe And 110Mm Dia Hdpe Main Pipe For Construction Of High Level Railway Crossing Bridge At Thotti Mannarai In Ward No 33. Tiruppur Corporation Gf 11
Kabaddi Court, Childrens Park, Recreation Area, Cricket Pitch, Play Equipment And Benches And Electrification Works Establishment Of Multi Sports Facility Centre Below Moochikkal Railway Over Bridge At Tanur Lac, Malappuram - Retender
Mud Badminton Court, Childrens Park, Recreation Area, Cricket Pitch, Play Equipment And Benches And Electrification Works Establishment Of Multi Sports Facility Centre Below Devadar Railway Over Bridge At Tanur Lac, Malappuram - Retender
Shifting Of Electrical Works On Either Side Of Buggavanka River Balance Length From Railway Bridge To Almaspet Bridge In Kadapa Town, Ysr
Supply And Installation Of Aio Led Solar Street Light At Railway Over Bridge In Lieu Of L.c. No.cp-2 On Puruna Jagannath Sadak Nayabazar To Madhupatana Ie Road
Construction Of 105mtr Wide Road, Protection Wall And Culvert From Sector Lamda To Boraki Railway Bridge