Bengaluru - Sampige Road Sec : Proposed Pedestrian Subways To Facilitate Crossing Of Railway Alignment By Cattle, Pedestrians And Smaller Vehicles In Various Locations As Rcc Box Size 1x5mx2.65m In Connection With Speed Increase Upto 130 Kmph (total Number Of Subways = 11 Nos) - Fabrication Of Rh Girders. Maintenance Period Is 03 Months
E-Tender For Labour Charges Of Under Ground Work For Laying 11 Kv Xlpe Cable Work Railway Bridge/Track/Nhai Crossing In All Scheme At Gadh S/Dn Phase-2 Under Palanpur Do-1 If Any Emergency In Any Sdn
E-Tender For Labour Charges Of Under Ground Work For Laying 11 Kv Xlpe Cable Work Railway Bridge/Track/Nhai Crossing In All Scheme At Palanpur Highway & City S/Dn Phase-2 Under Palanpur Do-1 If Any Emergency In Any Sdn
E-Tender For Labour Charges Of Under Ground Work For Laying 11 Kv Xlpe Cable Work Railway Bridge/Track/Nhai Crossing In All Scheme At Chandisar S/Dn Phase-2 Under Palanpur Do-1 If Any Emergency In Any Sdn
E-Tender For Labour Charges Of Under Ground Work For Laying 11 Kv Xlpe Cable Work Railway Bridge/Track/Nhai Crossing In All Scheme At Palanpur Rural S/Dn Phase-2 Under Palanpur Do-1 If Any Emergency In Any Sdn
E-Tender For Labour Charges Of Under Ground Work For Laying 11 Kv Xlpe Cable Work Railway Bridge/Track/Nhai Crossing In All Scheme At Kanodar S/Dn Phase-2 Under Palanpur Do-1 If Any Emergency In Any Sdn
Modification Work Of 220Kv S/C Rtgh-Jjn Tr. Line Bw Loc No. 342 And 343 At Railway Track Crossing Between Railway Tp Point 316/9 And 317/0 Of Ratagarh-Churu Section As Deposit Work Of Ms. Railway Mlin/22.13 On Labour Rate Contract Basis
Modification Work Of 132kv S/c Hisar Sadulpur Tr. Line Bw Loc No. 328 And 329 At Railway Track Crossing Between Railway Tp Point 171/3 And 171/4 Of Hmg-sdlp Section As Deposit Work Of Ms. Railway Mlin/22.14 On Labour Rate Contract Basis
E-Tender For Labour Charges Of Under Ground Work For Laying 11 Kv Xlpe Cable Work Railway Bridge/Track/Nhai Crossing In All Scheme At Dantiwada S/Dn Phase-2 Under Palanpur Do-1 If Any Emergency In Any Sdn
Electrical Work Shifting Of 33 Kv Lines From Vedant Railway Crossing To Bansadhara River Under Eso Viswanathpur Due To Road Widening Of Muniguda-ambadola Pwd Road From 2 Lane To 4 Lane From 37/00 To 63/600 Km During 2025-26