Design And Construction Of Rail Over Bridge Rob Between Railway Km 6-20 And 6-22 Between Karchha Station And Ujjain Railway Station Vrg-Mabg On Idu Section, Ujjain.
Consultancy Services For Technical Audit And Quality Assurance And Carrying Out The Safety Autditas Per Irc Morth Guidelines For The Work Of Construction Of Four Lane Railway Over Bridge In Lieu Of L C No. B-1 - 159 M Railway Km. 212/90 To 213/0 On Samdari - Bhildi Section In Banaskantha District. On Mitha - Tharad - Deesa Road Sh No. 54 Between Km. 75/0 To 77/0 Dist : Banaskantha State Gujarat 3Rd Attempt
Providing Project Management Consultancy For Construction Of Balance Work For Railway Over Bridge At Km 258/20-258/22 At Siddharth Nagar Canal Over Surat Mumbai Main Railway Line Joining Surat - Navsari Main Road And Karadva Area On Percentage Rate Basis.Non Railway Portion Only
Installation Of Decorative Poles At Naugawan Railway Crossing Over Bridge Completed
Provision Of Lighting Arrangements In Between Sulur Somanur Railway Limited Use Subway In Lieu Of The Existing Lc No.142 In Rasipalayam Thennampalayam Road Km.0/2 Railway Km.467/6-8 Road Over Bridge Railway Km.466/21 23 In Coimbatore District. Lighring Arrangement Between Sulur Somanur In Coimbatore
Provision Of Lighting Arrangements To Railway Km 26/500-600 Road Over Bridge At Railway Km.26/ 100-200 Limited Use Subway In Lieu Of The Existing Karamadai Tholampalayam Road Km.0/4 Lc No.11 In Coimbatore District. Lighting Arrangements Rob Coimbatore
-Construction Of Drain At Thammanam-Pulleppady Road Near Pulleppady Railway Over Bridge In Division 63 Kre1-1042/24 -Construction Of Drain At Thammanam-Pulleppady Road Near Pulleppady Railway Over Bridge In Division 63
Development And Beautification Work Of Nh 9 To Pilkhuwa Main Road With Over Bridge And Railway Road Intersection
Beautification Work In The Open Land Under The Railway Over Bridge In Ward No. 46 Gandhi Colony.
Drawing Ht Ug Cables Through Railway Over Bridge, Guruvayur Under Electrical Section Guruvayur