Ge/Token-39/2025-26 Repair To External Rain Water Drain, Common Area And Misc Repair Work Of Sanjay Vihar And Other Adjoining Units Of Age B/R-Ii Including Repair/ Replacement Of Internal Electrification, Db, Mccb, Mcb, Vtpn And Other Misc E/M Works At Sanjay Vihar, Hq
Repair Of Rain Water Drain Alongside The Land Of Daleep Kr, Anoop Kr, Towards The House Of Dheeraj Sharma And Construction Of Protection Wall Near Land Of Daleep Kr. Pyt Sadar Block
Proposed Construction Of Stores Depot At Krishnarajapuram. Sw-Ii: Krishnarajapuram/Diesel Shed: Proposed Rcc Flooring In Under Truck / Machine Repair Bays Including Rain Water Diversion Drain. Sw-Iii - Proposed Cc Flooring Apron At Incoming Line Of Ac Loco Testing/Inspection Facility In Connection With The Work Of Proposed Associative Work Of Phase Wise Electrification Work At Krishnarajapuram/Diesel Shed. Sw-Iv: Provision Of Road Extension And Dual Electrically Operated Lifting Barrier Eolb At Lc No. 129 At Km 325/400-500. Sw-V: Kuppam: Proposed Construction Of Tower Wagon Shed At Kuppam Station. Maintenance Period Is 6Months. Composite Work
Repair To Drain, Culverts, Rain Water Harvesting And Associated Works At Af Stn Najafgarh Under Ge Af Tiughlakabad
Proposed Construction Of Stores Depot At Krishnarajapuram. Sw-Ii: Krishnarajapuram/Diesel Shed: Sw-I: Proposed Rcc Flooring In Under Truck / Machine Repair Bays Including Rain Water Diversion Drain. Sw-Iii - Proposed Cc Flooring Apron At Incoming Line Of Ac Loco Testing/Inspection Facility In Connection With The Work Of Proposed Associative Work Of Phase Wise Electrification Work At Krishnarajapuram/Diesel Shed. Composite Work. Maintenance Period Is 6 Months
Repair To External Rain Water Drain Common Areas And Misc Repair Work Of Aps Colony Signal Enclave Sanjay Vihar And Other Adjoining Units Of Age Br Ii Under Ge Central Cantt 10
Certain Repair To Plaster Drain Cover Rain Water Pipe Brick Work And Kota Stone Flooring In The Aor Of Dipac Under Age I U B/R Delhi Cantt - 10
Campus Cleaning, Drain Repair, Paver Block Resetting, Rain Water Pipe Adjusting In Residence No. 12 To 17 At Harding Road
Remaining Work- Construction / Repair Of Damaged Boundary Wall, Desilting Of Rain Water Drain And Repair And Replacement Of New Building Corridor Floor, Window Glasses And Other Civil Misc. Works Revised. Eor To Non Residential Building At G.G.S.S. School D-Block, Ashok Vihar Under Sub Division North West B-6, Pwd Sh- Constructing Sitting Area In Basket Ball Ground And Laying Interlocking Tiles In School
Repair To External Rain Water Drain, Common Areas, Misc Repair And Misc E/M Works Including Daily Maints Complaints Work At Sanjay Vihar, Aps Colony, Signal Enclave, Pratap Chowk, Tarurus Enclave And Adjoining Areas Under Ge Central