Construction Of New Over Head Service Reservoir Of Capacity 700000 Litre At Adumbukadu, Supply, Laying Of Distributionnetwork, Providing Fhtcs Package-3 To Meenadomgramapanchayath In Kottayam District
Construction Of Two New Over Head Service Reservoir Of Capacity 40000 Litre At Palazhy And Supply, Laying Of Distribution Network With House Connection Under Package-10 To Meenadom Grama Panchayath In Kottayam District
1 Providing & Laying 600 Mm Dia. Di Rising Main From Paneli Wtp To Picnic Center Elevated Service Rerservoir 2 Construction Of 25 Mld Water Treatment Plant, Ground Service Reservoir Gsr, Elevated Service Reservoir Esr, Zero Liquid Discharge Units & Other Misc. Work At Paneli Lake 3 Operation And Maintenance Of Pipeline, Wtp & Zld Including Clear Water Sump & Pump House And Esr For Two Years At Paneli Lake
Construction Of New Over Head Service Reservoir Of Capacity 40000 Litre For Parampuzha And Pampookavala Package-9 To Meenadom Gramapanchayath In Kottayam District
Construction Of New Over Head Service Reservoir Of Capacity 50000 Litre At Amrutham Package-5 To Meenadom Gramapanchayath In Kottayam District
Construction Of New Over Head Service Reservoir Of Capacity 70000 Litre At Mundiyankal Package-4 To Meenadom Gramapanchayath In Kottayam District
Construction Of New Over Head Service Reservoir Of Capacity 90000 Litre At Triveni Package-6 To Meenadom Gramapanchayath In Kottayam District
Day To Day Operation, Maintenance And General Repair Of Clear Water Main From Dariapur Wtp To Service Reservoir At Dariapur, ...dariapur Wtp
Surveying, Collection Of Hydrogeological Data, Design, Detailed Engineering, Construct Ion, Supply, Installation And Commissioning Of Ground Water Based Multivillage Piped Water Supply Scheme Having 7.85 Mld Million Liter Per Day Capacity, 09 Nos. Of Tube Well Including 03 Nos. Of Stand By Tube Well, Igsrintermediate Gr Ound Storage Reservoir-2 Nos, Clean Water Mgsr Master Ground Service Reservoir - 01 No., Ugr Underground Reservoir- 06 Nos., Zonal Esr-07 Nos., Di-K7 & Dik9 Distribution Pipeline Network And House Connection Including Scada And Other Rel Ated Em Work Etc. In Panchayat Sadki, Athan, Sarodag, Adhaura, Badwankala, Dumraw A & Chainpura Under Adhaura Block Of Kaimur District, Bihar State With Minimum Six Months Of Trail Run And Therafter Operation & Maintenances Of The Entire System For Th E Next Seven Years
Construction Of 30000 Litres Capacity Service Reservoir 12.00M Staging Height, Borewell And Extension Of Pipeline At Mathaganeri Village In Avaraikulam Village Panchayat, Valliyoor Panchayat