Gem Bids For Pt Infra Structure, 839 Rope Nylone 32 Mm Rope Malina Vr 102 Cm Beam Wooden 12 Ft Coir Mat 5 Ft Width Brown Coir Mat 5 Ft Width Black Coir Mat 5 Ft Width Red
Gem Bids For 1 Horizontal Rope Structure
Gem Bids For 1 Vertical Rope Structure
Gem Bids For Procurement Of Pt Infra Structure, 1204 Rope Nylone 32mm Rope Malina Vr 102 Cm Beam Wooden 12 Ft Coir Mat 5ft Width Brown Coir Mat 5ft Width Black Coir Mat 5ft Width Red
Conducting Ndt Tests Of Man Riding System Along With Rope Power Pack Structure And Associated Accessories Of Vindhya Mine Of Johilla Area
Providing Supporting Structure For Rope Drum Hoist And Aligning Of Wire Rope Cable For Smooth Functioning Of Opa Barrage Spillway Gates.
Supply of Retro Fitting And Upgradation Of Vertical Rope Structure, 11 Retrofitting And Upgradation Of Vertical Rope Structure Retrofitting And Upgradation Of Chin Up Bar Structure Painting Work On Complete Structure Vertical Rope Painting Workn On Complete Chin Up Bar Finishing And Installation
Procurement Of Outdoor Physical Training Infrastructure Items For Trg Of Tps 6 Situp Bar Structure Thickness Of Pipe 2 Inch And Length 20 Ft And Height 3 Ft Vertical Rope Structure Thickness Of Pipe 4 Inch And 1 X Pipe Length 10 Ft With Hooks And Ropes And 2 X Pipes Height 20 Ft Horizontal Rope Structure Thickness Of Pipe 4 Inch And 2 X Pulley Wheel And 2 X Pipes 15 Ft Height With Rope Chinup Bar Structure 2X 4 Inch Thickness Pipe Length Of 10 Ft And 1 X 2 Inch Thickness Pipe Length Of 06 Ft Jute Mat 4X6 Ft For 9 Ft Ditch
Repairing And Maint Of Vertical Rope Structure Repairing And Maint Of Chin Up Bar Structure Repairing And Maint Of Toe Touch Bar Structure Repairing And Maint Of Push Up Bar And Hyper Extension Structure Repairing And Maint Of Sit Up Bar Struc Ture Pt Mat Cover Repairing And Maint Of Wall Bar And Rope Pulling Structure Repairing And Maint Of Rope Pulling Structure
Retrofitting And Upgradation Of Vertical Rope Upgradation Of Chin Up Bar Structure Painting Work On Complete Structure Vertical Rope Vertical Rope Paiting On Structure Finishing And Installation