Road Safety Audit On Pmgsy Roads 887.159 Km For Carrying Out Independent Road Safety Audits And Suggesting Rectification Measures For Black Spots, Road Safety Measures, Safe Road Etc In Different Blocks
Reconstruction Of Old Minor Bridge Banda Amboli Ghat At Ch. 38.850 And Construction Of Retaining Wall And Other Safety Measures In Ghat Portion In Km 00.00 To 47.800 Section Nh.548h
Providing Safety And Security Measures By Providing M.s. Grills In The Existing Windows Of Re-evaluation Branch In Coe Building In Hpu Shimla-5
Preparation, Design And Display Of Tableau Showing Concept Of Safety Measures On The Occasion Of Republic Day Parade On 26.01.2026
Construction Of Layers From Sub Grade To Binder/Wearing Course Having Width 24.00 Mt Below Internal Society Road And Reinstate Of Trench Line Falling In Sub Zone 1, 2, 3 & 4 In South Zone-A Udhana Of Surat City By Contractors Own Batch Mix Type Hotmix Plant And Wmm Plant Within Surat City Limit With Sensor Operator Paver Finisher Including Construction/Repair Of Footpath, Divider, Water Table And Providing & Laying/Fixing Of Pavement Markings, Road Stud, Road Signage With Other Traffic Safety Measures.
Estimate No.711/gdl/2025-26 Providing Digital Signal System For Safety Measures, At Ashti Sqaure, Chamorshi
Providing Drain Repairs To Avoid Overflow And Stagnation Of Drain Water On Road For Avoiding Accidents Under Road Safety Measures At Munsif Junction Of Kakinada Municipal Corporation. Recall
Resurfacing Of Roads Phase-17 Within Surat City Limit By Cement Grouted Bituminous Mix Cgbm By Contractors Own Drum Mix Type Hotmix Plant To Be Installed Within Surat City Limit With Sensor Operator Paver Finisher Including Repair Of Footpath, Divider, Water Table And Providing Laying/ Fixing Of Pavement Markings, Road Studs With Other Traffic Safety Measures.
Construction Of Tp/Non Tp Roads From Sub Grade To Wearing Course, Carpet/ Recarpet Having Width Below 24.00 Mt T.P. Road In Mota-Varachha-Uttran And Newly Added Villages Abrama, Valenja, Kathor, Umra, Bharthana-Kosad Falling In New East Sarthana Zone -B Jurisdiction Of Surat City By Contractors Own Batch Mix Plant And Wmm Plant To Be Installed Within Surat City Limit With Sensor Operator Paver Finisher Including Construction / Repair Of Footpath, Divider, Water Table And Providing & Laying/ Fixing Of Pavement Markings, Road Studs, Road Signages And With Other Traffic Safety Measures. 2026-27 Work No-01
Annual Maintenance Including Incident Management And Road Safety Measures From Km 0.000 To Km 47.250 Of Four Laning Of Tuticorin - Tirunelveli Section Of Nh-138 In The State Of Tamil Nadu On Item Rate Basis