Kumarakam Puthiyakavu Devaswom Kottayam Group Construction Of Drain On The North Side Of The Temple And Laying Interlocking Tiles
Providing And Laying Interlocking Tiles, Sewerage And Side Drain Of Various Rural Link Roads Under Rangla Punjab Scheme Year 2025-26 Distt Gurdaspur Fgc G-7
Construction Of Drain And One Side Guard Wall S/F Auto Stand More To Jorapani River, Jgat Tarini Kali Mandir To Jora Pani River, Abhijit Kundu House To Matangini More, Matangini Hazra Road, Anup 15/Wbmad/Smc/Upe/2025-2026
Construction Of Side Drain On Various Rural Link Road Under Rangla Punjab Scheme Year 2025-26 Distt Gurdaspur Fgc G-6
Thuravoor Devaswom Vaikom Group Constructing Drain At South Side, Cleaning Drain At North Side And Drain From Oottupura
Estimate For Rasing And Strengthening Of Right Bank Including Maintaining Side Slopes Of Dyalpura Drain Between R.d. 40000 To 90000 To Save Argicultural Land And Abadis Of Villages Kalyan Sadda, Dyalpura Mirza, Gumti Kalan, Bhai Rupa, Kothe Sukhanand
Construction Of Drain Both Side At Panchanan Sarani And Construction Of Drain At Aurobinda Pally Main Road.At Ward No-19 15/Wbmad/Smc/Upe/2025-2026
Repairing Of Bituminous Roads From Nh Service Road To Corporate Gate Including Road Side Drain Repairing At Khairasol Within Ward No- 28, Under D. M.C.
Construction Of Left Side Boundary Wall, Demolishing And Relaying Of Bed Of Drain Demolishing And Plastering Of Side Slope Of Drain For Smooth Flow In The Drain During Rainy Season For The Year 2024 25 Vijay Ghat Drain 3rd Call Desiltindisposal Maintenance Of 06 Months
Sh Formation Cutting Retaining Structures Cross Drainage Paver Blocks Vshape Side Drain Road Side Drain Road Side Essential Parapets Road Signages And Dumping Sites In Km 0/0 To 5/205 Under Nabard Ridf Xxxi I/c 5 Years Maintenance Construction of Link Road From Dhaned To Talasi Via Shiv Nagari Km 0/0 To 5/205