Signalling Work In Connection With : Sdah Division -Diamond Crossing-27 Sets.
Signalling Work I.C.W. Replacement Of Shelf Type Relay With Plug-In Type Relays In Lucknow Area Of Lucknow Division Of Northern Railways.
Signalling Work In Connection With Augmentation And Upgradation Of Datalogger Installed Over Delhi Division.
Signalling & Telecom Work In Connection With Providing & Fixing Various Safety Fencing Along The Track To Prevent Trespassing On Lnl-Pa-Dd Section Running Length 290 Km Of Pune Division.
Signalling Work In Connection With Construction Of Additional Loop Line With Standard Layout Of B Class At Jayasingpur And Rukadi Station.
Signalling Work In Connection With Construction Of Pol Loading Terminal Of M/S Bharat Petroleum Corporation Ltd. Taking Off From Rasayani Railway Station In Pnvl-Roha Section.
S&T Work In Connection With Provision Of Ballast Less Track In Maihar, Satna, Katni, Kmz, Damoh & Sagour Stations Jabalpur Division Of West Central Railway Signalling & Telecom Work.
Signalling Work In Connection With Tbr 121.300 Tkm And 64.300 Tkm In Bpr-ksj Section And Reliability Improvement Of Power Supply Arrangement For Signalling Equipments Installed At Various Stations And Lc Gates Of Izn Division.
Signalling Work In Connection With Widening Of Pf-1&2 At Cpyz End, Pf-3&4 At Dli End, Pf-5&6 At Dli End Including Slewing Of Track And Provision Of Two Stabling Lines With Rpc-4 Facility At Gzb Station.
Signalling Work In Connection With Pwp 31061-Ttr Fs+Tws+Wcmsc- 30 Sets 60Kg 1 In 12 In Howrah Division. Schedule B- Signalling Work In Connection With Tsr P 9.015 Tkm Kankhana-Sntsainthia Up In Howrah Division. Schedule C- Signalling Work In Connection With Tsr P 32.572 Tkm Blybally-Skgsaktigarh Up Chord, Rev Line In Howrah Division. Schedule D- Signalling Work In Connection With Hwh Division Trrp Rphrampurhat- Dumka & Kankhana - Sntsainthia Section 1.810 Km In Howrah Division. Schedule E- Signalling Work In Connection With Hwh Division Trrp Rphrampurhat-Dumka Sl 153.00-154.800 - 1.800 Km In Howrah Division. Schedule F- Signalling Work In Connection With Hwh Division Ctrp Adlandul - Dkaedankuni Up 0.540 Km & Trrp Rphrampurhat - Dumka Sl 0.700 Km . Total Ctrp 0.540 & Trrp 0.700 Km In Howrah Division. Schedule G- Signalling Work In Connection With Hwh Division Ctrp Blybally-Bdcbandel Up 2 1.00 Km In Howrah Division. Schedule H- Signalling Work In Connection With Trrp- 1.936 Km, Skgsaktigarh-Bwnbarddhaman Dn Hbc 100.954 - 102.890 Total 1.936 Km In Howrah Division.