Relocation Of Storage Tank And Cooling Unit Of Gold And Silver Plating Plant, Preparation Of Bed And Platform, Repairing Of Gi Pillars, Dismantling And Shifting Of Storage Tank, Dismantling And Shifting Of Chiller Unit, Supply And Fixing Of 1.25 Inch Hose Pipe, Fixing Of 1.25 Inch Thermal Insulated Pipe, Fixing Of 0.5 Inch Flexible Pipe, Preparation Of Concrete Platform, Supply And Fitting 0.75Hp Pump, Supply And Fitting 5 Inch Dia. Upvc Vent Pipe