Civil Work I.E. Extension Of Br.No.51 At Km.344/078 With 4.00X2.50M Rcc Box & Br.No.52 At Km.344/078 With 6.00X3m Rcc Box And Shifting Of Duty Hut At L-Xing No.27 At Km 343/292 In Gzs Yard Under Aden-1/Fzr In C/With Removal Of Psr And Facilitating Simultaneous Reception In Gzs Yard.
Track Work In C/With Removal Of Psr And Facilitating Simultaneous Reception In Gzs Yard Under Aden-1/Fzr.
S&T Work In C/W Removal For Psr And Facilitating Simultaneous Reception In Giani Zail Singh Sandhwa Yard.
Trd Work In C/W Removal Of Psr And Facilitating Simultaneous Reception In Gzs Yard Over Firozpur Division.
Alteration In Siemens Make Ei Electronic Interlocking System At 03 Stations In Connection With Correction In Yard Layout Work At : I Bhkh: Increasing Of Up Long Haul Loop Line At Least Upto 1400 Mtr. For Accommodating Long Haul Trains. Ii Jhn: Yard Remodeling For Increasing The Csl Of Dn Side Common Loop And Over Run Line In Up Loop Line For Simultaneous Reception & Dispatch Facility At Jakhim Station.Iii Jpl: Extension Of Shunting Neck 50 M Of Line No. 5 At Seb Side At Jpl.
Provision Of Additional Loop Line With Simultaneous Reception Facilities.
Execution Of Ohe Modification Work In Connection With Grid Separation Work At Paradeepprdp For Simultaneous Reception Of Up Trains Both From Ctc And Hds Direction To Adb Grid And Dispatch Of Dn Trains From Adb Grid With Some Left Over Ohe Modification Work In Ppt Yard.
Ohe Modification Due To Proposed Increase In Csr Of Road 10 Pf No. 7 With Simultaneous Reception And Dispatching Facilities Towards Mys End At Sbc Yard Work - Leftover Works
Electrical Work In Connection With Provision Of Full- Length Additional Loop Line With Simultaneous Reception Facility At Berach Cabin.
Pandurangaswamy Road: Additional Loop Line With Simultaneous Reception & Dispatch Facility.