Ichp -Clearing The Slided And Spilled Coal Along The Walkways Over Below Deck Sheets, Between The Track Rails And Outside The Track Rails Both North, South Sides Of Stacker-I And Reclaimer-I Machines Travel Path In Conveyor-49.
Ichp- Removal Of Carbon And Dust Scales Deposited In The Internal Electrical Components And Operation And Tightness Checking Of Lt Breakers, Transformers Etc. Stacker-I Ii And Reclaimer-I Ii Machines.
Ichp- Fabrication Of Boom Conveyor Brake Drum For Stacker And Reclaimer Machines.
Ichp- Cleaning Of The Spilled And Accumulated Coal In Stacker-I Ii And Reclaimer-I Ii Machines Associated Areas And Removal Of Coal Chocking In Coal Transfer Chutes In All The Four Machines.
Ichp -Clearing The Slided And Spilled Coal Along The Walkways Over Below Deck Sheets, Between The Track Rails And Outside The Track Rails Both North South Sides Of Stacker-Ii And Reclaimer-Ii Machine Travel Path In Conveyor-54.
Ichp- Overhauling Of Various Capacity Of Lt Motors In Stacker-I Ii And Reclaimer-I Ii Machines
Ichp-Fabrication Of Pcrd And Ccrd Roller Assembly For Stacker And Reclaimer-I And Ii Machines
Ichp-Fabrication Of Pcrd Ccrd Chain Brackets For Stacker And Reclaimer
Supply Of Power And Control Trailing Cable For Stacker Cum Reclaimer And Reclaimer Installed At Coal Handling Plant At Ssctpp
Removal Of Spilled Over Coal And Fine Dust At Stacker Cum Reclaimer-1 And 2 And Along And Underneath Of Bcn-8 And 9 Conveyor By Head Loads On To Running Conveyor From 01.12.2025 Or Actual Date Of Commencement To 31.03.2026 Required In Mm-iv Sub Division Of Mm/chp/btps.