Supply Of Wall Protector For Lavatory Pan Stainless Steel.
Supply Of Modified Unified Pressing Of Stainless Steel Lavatory Inlay For Pan & Commode Cn Coaches One Set Consisting Of Col. V 01 No., Col. Xii 01 No. & Col. Xiv 02 Nos. To Drg. No. Misc Sk-3616 Sheet 01 Of 02, Alt. 3 & Misc Sk-3616 Sheet 02 Of 02, Alt. 5.
Supply Of Modified Unified Pressing Of Stainless Steel Lavatory Inlay For Pan & Commode Of Icf Cn Coaches As Per Col-xi Of Drg. No. Misc Sk-3616 Sheet 01 Of 02, Alt. 3 & Misc Sk-3616 Sheet 02 Of 02, Alt. 5..
Supply Of Stainless Steel Funnel For Lavatory Pan Outlet As Per Drawing No.crws-sk-946. Material Should Be As Per Is:6911-92 Grade 304. Warranty Period: 30 Months After The Date Of Delivery
Supply Of Lavatory Door Catch Stainless Steel To Icf Drg. No. Icf/sk-5-6-090 Col.ii Alt.e Warranty Period: 30 Months After The Date Of Delivery
Supply of Wall Protector For Lavatory Pan Stainless Steel To Rdso Drg. No. Cg-K6085, Alt.-1 Or Latest. Warranty Period: 30 Months After The Date Of Delivery
Supply of Lavatory Stainless Steel Turn Over Latch To Rcf Drg. No. Lw56430 Alt.Nil Except Item Nos.2, 3 &5 Warranty Period: 30 Months After The Dat E Of Delivery
Supply of Stainless Steel Dustbin Inside Lavatory.
Supply of Lavatory Door Catch Stainless Steel To Icf Drg No:Icf/Sk-5-6-090, Col.Ii, Alt: E. Warranty Period: 30 Months After The Date Of Delivery
Supply of Stainless Steel Lavatory Inlay For Guard Room Lavatory In Gslrd Coaches As Per The Icf Dra Wing Slr2-4-1-203 Alt G Col I. Make- Nil Warranty Period: 30 Months After The Date Of Delivery