Construction Of cement concrete Road Village Arwariya Stop Dam To Arwariya Berkhedi River Bridge Length 0.60 Km. And Construction Of cement concrete Road From Thanner To Gufa Mandir Road To Jind Maharaj Temple Length 0.60 Km. Total Length 1.20 Km. Iind Call
Ballance Work Of Ground Water Recharging Through . Recharge Shaft With Vertical Filter To Be Constructed In The Submergence Of Reservoir/Pond/Stop Dam Of Different Villages Of Block Bhitarwar District Gwalior Richarge Shaft
Ground Water Recharging Through 04Nos. Recharge Shaft With Vertical Filter To Be Constructed In The Submergence Of Reservoir/Pond/Stop Dam Of Different Villages Of Block Morar District Gwalior Richarge Shaft
Ground Water Recharging Through 10 Nos. Recharge Shaft With Vertical Filter To Be Constructed In The Submergence Of Reservoir/Pond/Stop Dam Of Different Villages Of Block Dabra District Gwalior Richarge Shaft
Ground Water Recharging Through 10 Nos. Recharge Shaft With Vertical Filter To Be Constructed In The Submergence Of Reservoir/Pond/Stop Dam Of Different Villages Of Block Ghatigoan District Gwalior Recharge Shaft
Stop Dam Construction Work With All Materials Except Curry Shutter
Construction Of Stop Dam With Rapta At Gram Panchayat Tiwarkhed, Block Prabhatpattan, Dist.Betul
Construction Of Slab Culvert Banshipur To Girda Ch. 4125 Mt And Stop Dam Work Goraiya Nadi Par Kharraghat Construction Of Slab Culvert And Stop Dam
Installing Of Gate In Stop Dam In Ambedkar Ward
Construction Of Rapta Cum Stop Dam Kakraha Nala Gp Umari Madhaw Jp Mauganj Distt. Mauganj M.p.