Dismantling Of All Substructure And Superstructure Parts Complete In All Respect Dismantling Of Rcc Slab Bridge Over Seer Khad Span 38.00 Metre On Sapri Panhar Road At Rd 12/120
Preparation Of Gad, Design & Detailed Estimate Along With Verification Of Existing Data And Designing Of Strengthening Of Existing Substructure Of Bridges If Required For Making Fit For Dfc/25t Loading Standard For 28 Nos Bridges In Nwr.
Construction Of Foundation & Substructure Of Additional Shore Span Of 30.5m On Both Ends Along With Jacketing Of Bottom Beam Of Pier P13 & Providing Protection Arrangement For Steel Plates Provided Below Bearings Of Bridge No.16 On River Ghaghara Between Manjhi-bakulaha Stations Of Chhapra- Aunihar Section Of Varanasi Division Of North Eastern Railway
Strengthening Of Substructure And Replacement Of Existing Steel Girders Of 12.2m Span Of Major/important Bridges Of Br.no.284x12.2m In Bti-sog Section, Br.no.688x12.2m In Bti-sog Section, 724x12.2m In Sog-lgh Section, 028x12.2m In Sog-srpr, 725x12.2m In Sog-aph Section, 175 4x12.2m In Bti-hsr Section Of Bkn Division And Br No.35a5x12.2min Smr-bldi Section Of Ju Division Bridges By Post Tension Psc Slabs, Lifting /linking Of Track, Supply Of Ballast, Earthwork, Blanketing Work And Other Ancillary Work As Per 25t Loading Standard In The Jurisdiction Of Dy Ce/bridge Line/jp.
Construction Of Kalindi Market Building Substructure Part In Ward No-20. Wbmad/ulb/sddm/nit253/7/25sl8
Construction Of Substructure Including Fabrication Of Superstructure & Its Launching For Important Bridge No. 247 10x61.0 M And 287 10x61.0 M With Double D Type Well Foundation For Double Line With Rdso 25 T Axle Loading Standard Over River Rapti Between Balrampur - Bahraich Stations In Connection With New Line Work Between Khalilabad- Bahraich Section Of North Eastern Railway.
Rehabilitation Of Substructure Including Curtain/drop Wall, Flooring Protection Works In All Minor Bridges In Hjpex-chpgex Section.
Replacement Of Steel Girder With Psc Slab Along With Strengthening Of Substructure To Make It Fit For 25T Loading For Br. No. 26 Dn Line, Span 3X8.22 M At Km 14/28-26 14.612 On Rpj-Bti Section.
I Jacketing Of Bridge Substructure Alongwith Supplying Structural Drawing In C/w Replacement Of Steel Girders Of Bridge Of Br.no. 71 3x8.54m, 2x3.35m At Km 28/1-2 Between Ahh-kup With Psc Slab On Ldh - Dui Section Under Aden/pta Ii Jacketing Of Bridge Substructure Alongwith Supplying Structural Drawing In C/w Replacement Of Steel Girder Of Bridge Of Br.no. 19-a 5x6.10m At Km 21.773 With Psc Slab Between Jps-ukn On Jhl-hsr Section Under Aden/pta.
Construction Of 2 Lane Rob Railway Portion 1 X 30 M Composite Girder In Lieu Of Lc 07 At Km 07/19-21 On Pile Foundation, Substructure, Superstructure Girder Work And Other Misc. Works In Indore-dewas-ujjain Section Of Ratlam Division Of Western Railway.