Supplying And Laying Of Distribution Pipeline Of Different Diameter Of Hdpe Pipes.........Zone 12 A, 12 B, 13 A, 13 B, 14 A, 14 B, 15, 16, 17 A, 17 B......... Under Amrut Within Haldia Municipality. Further Remaining Balance Work After Final Survey Wbmad/Ulb/Hm/5712/Nit-2025/2Nd Call Dt- 14.11.2025.
Gem Bids For Custom Bid For Services - Outsourcing Of Support Servicesfor Carrying Out Geological Survey Sampling And Boreholelogging Work At Rg Office Neem Ka Thana Camp Sikardistrict Rajasthan Western Region Amd
Gem Bids For Soil, Standard Penetration Test For Single Living-In Accn, Standard Penetration Test For Car Parking, Standardpenetration Test For Scooter Shed, Open Pit Excavation Ortrial Pit, Plate Load Test, Topographical Survey Of Land Andearth Work
Engaging Agency For Survey Work In Connection With Civil And Underground Piping Project At Pfcc Unit At Nrl Numaligarh Assam Bnr/40090/Nit/Survay Work/02
Survey Work In Municipal Area Arc
Balance Final Location Survey Work For Alignment Plan, Yard Plan, Drawing For Minor Bridges, Major Bridges, Rob/rub, Fob, Level Crossing Drawings, Hydrological & Geotechnical Investigation, Preparation Of Dpr Along With Detailed Estimate Etc All Other Ancillary Survey Works, Assistance Required For Land Acquisition, Forest Clearance In Connection With Defreezed Project Sultanganj -katuria New Bg Line Via Asarganj Tarapur & Belhar In The Jurisdiction Of Dy.ce/con/bgp
Survey Work With Preparation Of D.P.R. For Construction Of Parsauna To Mada Mp-Mdr-12-14 Length 24.61 Km. For Proposed Four Lane Road, Under Pwd Sub Division Waidhan, Distt. Singrauli M.P.
Survey Work With Preparation Of D.P.R. For Construction Of Sidhi Tikari To Sarai-Rajmilan Road Mp-Mdr-12-12 Total Length 84.20 Km. From Sarai To Rajmilan Length 42.00 Km. For Proposed Four Lane Road, Under Pwd Sub Division Waidhan, Distt. Singr
Survey Work With Preparation Of D.P.R. For Construction Of Sidhi Tikari To Sarai-Rajmilan Road Mp-Mdr-12-12 Total Length 84.20 Km. From Nigari To Sarai Length 42.20 Km. For Proposed Four Lane Road, Under Pwd Sub Division Deosar, Distt. Singrauli
Survey Work With Preparation Of D.P.R. For Construction Of Barigawan- Parsauna- Waidhan Mp-Mdr-12-A-1 Length 27.28 Km. For Proposed Four Lane Road, Under Pwd Sub Division Waidhan, Distt. Singrauli M.P.