Testing Of 220/132 Kv Relays Installed At 220/132 Kv Grid Sub-station At Phaphund, Dadri And 132 Kv Tr. Line Relays At Various Traction Sub- Stations/switching Station/dfccil Lilo Circuit & Calibration Of Testing Equipment's In Jjk-gzb Section Over Prayagraj Division Of N. C. Railway (for Two Years)
Design/modification, Supply, Erection, Testing And Commissioning Of 132kv/55 Kv Scott Connected Traction Sub Station And Switching Posts With At Between Feeding Bhadanpur (incl.) - Manikpur (excl.) - Satna (incl.) - Rewa (incl.) Section (without Scada) Of Jabalpur Division, W C Railway In Connection With Up- Gradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System Of Wcr To Meet 3000 Mt Loading Target.
Supply And Spreading Of 20/25 Mm Gravel/ballast Inside Switching Station/traction Sub-station In Lko(ex)-sln-zbd Section In Connection With Gm Inspection.
Modification Of Bus Arrangement To 1.5 Inch Pipe Bus In Fabricated Structure At Barjora 33By11 Kv Sub Station For The Proposed Switching Sub Station At Wbidc Industrial Park Barjora Under Bankura Division
Design/modification, Supply, Erection, Testing And Commissioning Of 132kv/2x25 Kv Scott Connected Traction Sub Station And Switching Posts With At Between Bina To Rta Section Of Bhopal Division Of W C Railway To Meet 3000mt Loading Target
Establishment Of A Switching Station At Tundla (tdl/ssp) To Replace Existing Gantries For Remote Isolation Of Yard Lines
Construction Of Additional Water Collecting Tank Adjacent To Existing Tank To Prevent Seasonal Choking Of The Tank And Outlet Pipe In The Vicinity Of 33 Kv Switching Station Palchan Tehsil Manali Distt. Kullu. Hpptcl/Piu Sarabai/Tenders/Sms/2025-26/16
Upgradation Of Different Circuit Breaker With Advance Tripping Protection System For Different Circuit Breaker At Switching Sub Station And 12 No Sub Station Under Aaodcm Dhori Area
Planning Designing Supply Installation Testing And Commissioning Of 33Kv Switching Station With All Electrical Mechanical And Scada Automation System Equipment Including Civil Construction Of Switching Station And 33 0.415Kv Electrification St
Outsourcing Of Manning And Maintenance Activities Of Tss & Switching Station Of Bsl Division For 01 Year