Rough Cost Estimate For Construction Of Guru Ka Khu Gate To Bugga Pulli With Pc, Stone, Wet Mix, Tack Coat At Mc Tarn Taran
Maintenance Of Tlakshi Village Approach Road Length 0.660 Km, Under Jampui Hill Sub-division, Pwdrnb During The Year 2025-26 Sh Clearing N Grubbing Road Land, Mtc. Of Earthen Shoulder, Surface Drain, Wbm-2, Wbm-3, Tack Coat, Patch Carpeting, Seal C
Sh-metaling, Grouting, Re-carpeting, Tack Coat, Seal Coat, Surface Drain Etc. During The Year 2025-26. Gr-i Mtc. Of Road From Jolaibari-kowaifung Road To Hara Ch. Para
Sh- Grouting, Re-Carpeting, Tack Coat, Seal Coat Etc. During The Year 2025-26 Mtc. Of Road From Nh-08 Kakulia To Dalucherra
Providing And Laying Of Tack Coat Dbm And Bc Service Road At Construction Of 2 Lane Rob Baraut Meerut Road In Lieu Of Lxing No. 48t On Delhi Shahdara Shamli Saharanpur Rail Section Near Baraut Railway Stn
Providing And Laying Of Bc 30 Mm Thick, Bm 50 Mm Thick, Tack Coat, Berm Filling And Edge Marking Bet Km 7.0 And Km 40.06 Net Length 14.51 Km Shredded Plastic Waste To Be Used For 3.63 Km Length On Road Mon-lungwa Under P Sewak
Sh- Wbm Gr-3, Wbm Gr-2, Grouting, Re-carpeting, Tack Coat, Seal Coat Etc. During The Year 2025-26. Gr-ii Mtc. Of Road From T08 Baikhora-kakulia Via Muhurpur To Madhyapara L086
Sh-Metaling, Grouting, Re-Carpeting, Tack Coat, Seal Coat, Surface Drain Etc. During The Year 2025-26. G- I Mtc. Of Road From Jolaibari To Kalashi Via Bathanbari
Maintenance Of Road From Nh44a Main Road To Badu Para Approach Road Under Jampui Hill Sub-Division During The Year 2025-26 Sh- Earth Filling, Gsb, Wbm-2, Wbm-3, Pot Holes Repair, Tack Coat, Carpeting, Seal Coating, Bamboo Palasiding Etc.L- 0.125 Km
Providing And Laying Tack Coat And 25mm Thick Bituminous Concrete In Km. 0/0 To 5/060 Including 5 Year Routine Maintenance After Periodical Renewal. Providing And Laying Annual Surfacing Periodic Maintenance On Dehan To Malag Buhlli Road Km 0/0 To 5/060 Of Pmgsy Roads Under Performance Incentive 2025-26 In The State Of Hp