Earthwork Excavation, Gsb, Wmm, Primer Coat, Tack Coat, Renewal Of Surface With Bm And Bc, Dr R/w, Cc R/w, Construction Of Culverts, Rock Blasting, Parapets, Cautionary,
The Items Included In The Estimate Are E/w, Pot Hole Filling, Tack Coat, Chipping Carpet And Seal Coat And Irish
In The Estimate It Is Proposed To Scarify The Existing Bituminous Road From Chainage 230 To 403.50M.Items For Prime Coat With Ss1, Tack Coat With Rs1 And Mss Are Included In The Estimate. Chennam Pallippuram Gp Ward 15 17 Divakaran Bhagavathar Kariyil Road Retaring
In The Estimate It Is Proposed To Scarify The Existing Damaged Tar Road From Chainage 0 To 190.M Towards South.The Item For Prime Coat, Tack Coat And Mss Is Proposed In The Estimate.The Berm Filling Is Also Proposed Tsybp/ 2025-26/Project No 30/Chennam Pallippuram Ward 5 Convent Koppayi Road Re-Tarring
Recarpeting Of Balance B And C Road In Sector 8, 9, 10 Ward No 4 Mc Panchkula By Providing 25mm Thick Bc With Tack Coat Leveling Course With Dbm
Recarpeting Of B Road In Sector 6 Ward No 2 Mc Panchkula By Providing 30mm Thick Bc With Tack Coat Leveling Course With Dbm
Annual Renewal Of Talai To Khadarb Road In Km. 0/00 To 2/080. Sh Providing And Laying Tack Coat, 25mm Thick Bituminous Concrete In Km. 0/00 To 2/080. Under Amp 2025-26.
P/L G -Iii, Prime Coat, Tack Coat And Bituminous Concrete 25 Mm Thick At Rd 4/200 To 4/550, 6/500 To 7/100 And 7/650 To 8/550 Restoration/Reconstruction On Sansai Dhandole Road Km 0/00 To 9/00 Under Sca
Maintenance Of Road From Nh44a Main Road To Santi Mension Institute Under Jmupui Hill Sub-Division During The Year 2025-26 /Sh Earth Filling, Gsb, Wbm-2, Wbm-3, Pot Holes Repair, Tack Coat, Carpeting, Seal Coating, Bamboo Palasiding Etc.L 0.125 Km.
Patch Maintenance Of Kanchanpur Tsr Camp Internal Road Length 0.920 Km, Under Jampui Hill Sub-Division, Pwdrnb During The Year 2025-26 /Sh- Clearing N Grubbing Road Land, Mtc. Of Earthen Shoulder, Surface Drain, Wbm-2, Wbm-3, Tack Coat, Patch Carpe