(a) Rajkot Division- Provision Of Ballast Less Track At Hapa Pf No. 1 And Okha Pf No. 1 = 1431 Rm (b) Rajkot Division: -provision Of Standard Power Supply Sockets At Track Machine Sidings.
Supply & Loading Into Railway Wagons/ Hoppers And Unloading The Same 96112 Cum Of 50 Mm Size Machine Crushed Hard Stone Track Ballast At Bakudih/ Rajgram /pinargaria Quarry Siding For The Jurisdiction Of Ranchi Division (measurement Will Be Done At Destination).
Supply & Loading Into Railway Wagons/ Hoppers And Unloading The Same 100018 Cum Of 50 Mm Size Machine Crushed Hard Stone Track Ballast At Pakur/ Taljhari/ Barharwa Quarry Siding For The Jurisdiction Of Ranchi Division (measurement Will Be Done At Destination).
Supplying Of 30000 Cum Of Machine Crushed Track Ballast 50 Mm Size Conforming To Rdso's Specification Of Track Ballast (feb - 2023 Edition With Up To Date Correction Slips) And Loading The Same Into Any Type Of Raiwlay Wagon, F.o.r Sakarigali For Sonpur Division.
Construction Of Ballast Less Track For Yard R3 At Cuttack Railway Station Under Khurda Road Division Of East Coast Railway.
Construction Of 3rd Line Between Naupada (nwp) And Vizianagaram (vzm): (package:03). Execution Of Earthwork In Formation, Blanketing, Minor Bridges (excluding Major Bridges With Formation In Approaches For 100 Meters Length On Either Side And Other Connected Protection Works) Lcs, Lhs, Rubs, Drains, Protection Works, Fobs, Service Buildings, Platform Works, Passenger Amenities, Track Ballast Supply, P.way Works And Other Connected Ancillary Works Etc,. Along With Ohe & General Electrification Works And S&t Utility Shifting Works In Connection With 3rd Line Between Naupada Jn. (nwp-km:702.20) Excluding To Km:740.00 (including Urlam Station) Of Waltair Division In East Coast Railway.
Construction Of 3rd Line Between Naupada (nwp) And Vizianagaram (vzm): (package:04). Execution Of Earthwork In Formation, Blanketing, Minor Bridges (excluding Major Bridges With Formation In Approaches For 100 Meters Length On Either Side And Other Connected Protection Works) Lcs, Lhs, Rubs, Drains, Protection Works, Fobs, Service Buildings, Platform Works, Passenger Amenities, Track Ballast Supply, P.way Works And Other Connected Ancillary Works Etc,. Along With Ohe & General Electrification Works And S&t Utility Shifting Works In Connection With 3rd Line Between Urlam (ulm-km:740.00) Excluding To Km:785.00 (including Sigadam Station) Of Waltair Division In East Coast Railway.
Construction Of 3rd Line Between Naupada (nwp) And Vizianagaram (vzm): (package:05). Execution Of Earthwork In Formation, Blanketing, Minor Bridges (excluding Major Bridges With Formation In Approaches For 100 Meters Length On Either Side And Other Connected Protection Works) Lcs, Lhs, Rubs, Drains, Protection Works, Fobs, Service Buildings, Platform Works, Passenger Amenities, Track Ballast Supply, P.way Works And Other Connected Ancillary Works Etc,. Along With Ohe & General Electrification Works And S&t Utility Shifting Works In Connection With 3rd Line Between Sigadam (sgdm-km:785.00) Excluding To Km:819.60 (including Vizianagaram Station) Of Waltair Division In East Coast Railway.
New Coochbehar - Golakganj (sl) - Tsr(p)-37.300 Tkm & Raninagar Jalpaiguri - New Cooch Behar (up) - Lifting Of Track And Recoupment Of Ballast - 11.558 Tkm.
Provision Of Ballast Less Track 03 Nos. At Nanded Station (road 1-720m, Road 2- 720m And Road 3 - 700m)