Sr. Den/north/sbc Sec : Supply Of Ballast At Makajapalli (mkj) Depot (quantity = 18,100 Cum) Including Leading And Loading In Connection With The Works Of (a) Complete Track Renewal (p) Of Existing 60kg Rails On 60kg Psc Of 1660 Nos/km With 60kg/90 Uts R-260 Rails And 60kg Wider Base Sleeper Of 1660/km For A Length Of 5.5 Tkm From Km 130/000-135/500 (dn) In Sse/pway/pkd Section, (b) Ctr(p) For A Length Of 0.6 Kms From 0/000-0/600 At Pkd Yard Rd-1 (sspn Line) And Ttr (primary) Of Point Number 62a At Pkd Yard Between Km 0/180-0/240 (1 Set) In Sse/pway/pkd Sec, (c) Ttr Of Existing Curved Switch, Cms Crossing And Psc Sleepers With 60kg Tws And 60kg Weldable Cms Crossing And 60kg Psc Fan Shaped Layout - 1in12 Total 24 Numbers, (d) Ttr Of Existing Curved Switch, Cms Crossing, Psc Sleepers With 60kg Tws, 60kg Weldable Cms Crossing And 60kg Psc Fan Shaped Layout - 38 Numbers And 1in8.5 - 4 Numbers, Total 38 Numbers In Sse/pway/hup Sec
Rail Renewal For 107 Track Km (tkm) Length With 52 Kg, 260m Rail Panels At Identified Patches Under Sen/madgaon From Km 378/100 To 556/600 In Senior Regional Engineer Karwar In Goa And Karnataka State. (computer No.69828, Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable)
Rail Renewal For 26 Track Kms (tkm) Length With 52 Kg 260m Rail Panels At Identified Stretches Under Senior Regional Engineer, Ratnagiri Section From Km 0/800 To 378/100 In Maharashtra State. (computer No.69832 Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable)
Rail Renewal For 70 Track Kms (tkm) Length With 52 Kg, 260m Rail Panels At Identified Stretches Under Sen Udupi Section From Km 556/600 To Km 739/760 In Senior Regional Engineer, Karwar In Karnataka State. (computer No.69818, Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable)
Signalling Work In Connection With Through Track Renewal (ttr) Along With Installation Of Tws-204 Sets (1:12) In Ngp-durg Section Of Nagpur Division Of Secr.
Execution Of Complete Track Renewal (primary) I.e., Ctr(p) Of 10.400 Tr. Km. In The Section Of Panskura - Haldia Under The Jurisdiction Of Aden/tamluk.
Through Rail Renewal (primary) For 13.547 Tr. Km, Removal Of 521 Nos Dummy Glued Joint At Yard Between Bksc-tkx, Ada-gmo, Mdn-vsu, Ksx-bksc, Ada-gmo (jc), Ada-bqa Section, Through Rail Renewal(secondary) For 5.26 Tr. Km Between Rukni- Bhojudih, Turnout Fastening Renewal 1 In 12 & 1 In 8.5, Renewal Of Cms Crossing 1 In 8.5-6 Sets & 1 In 12-11 Sets , Turnout Fastening Renewal For 64.324 Tr. Km , Through Rail Renewal(primary) For 19.943 Track Km At Bokaro Steel City Yard, Renewal Of 29 No. Sej & 34 Nos. Of Glued Joint, Tfr(gfn Liner)- 1.511 Tkm , Tfr(metal Liner)-8.839 Tkm, Ttr(tws)(1 In 8.5)- 6 Sets, Ttr(fs+tws+wcmsc)(1 In 12)- 6 Sets, Ttr(fs+tws+wcmsc)(1 In 8.5)- 3 Sets, Ttr(ds) - 5 Sets, Ttr(tsr) (1 In 12)- 5 Sets And Ttr(tsr)(1 In 8.5)- 51 Sets Under The Jurisdiction Of Den North Adra.
S&t Work In Connection With Construction Of New Bridge & Diversion Of Bridge Including Track Renewal Work In Jaj-ddu Section Under Danapur Division
Repairing/ Re-strengthening Of Supporting Structure And Renewal Of Rail Track For Unit 403-a Travelling Tripper At Moonidih Coal Washery..
(1)complete Track Renewal (secondary) - 7.257 Tr.km (2) Complete Track Renewal (secondary) - 1.875 Tr.km (3)trr(s)-2.636 Tr.km Under The Jurisdiction Of Den(central)/adra.