Repair Routine Maint Of 11 Kv Steped Down Transformer Of P8i Mafi Sub Station I And Ii Adr Atc Simulator Etc Including Ht Cable And Other Connected Work At South Side Runway Under Age Emi Of Genw Vasco
Internal Inspection Work Of 500 Mva Ict Toshiba Make Power Transformer At 400 Kv Sub Station
Centrifuging Of 200mva Aditya Make And 160 Mva Emco Make Power Transformer-ii Installed 400kv Sub Station Sarnath
Repairing And Gas Kit Changing Of 02 Nos. 500Kva 11Kv/440Volts Lighting Transformer At Sub-Station Of Washery Division
Complete Rewinding Of Ngf Transformer Into 11Kv/440V 1000Kva Transformer At Madhuban Dg Sub-Station Under Block-Ii Area
Operation And Comprehensive Maintenance Of Electro Mechanical Services At T.E. Mahanagar, Lucknow. Sh Repairing/ Replacement Of Faulty Mccbs In Existing Mv Panel In Transformer Sub Station
Increasing Capacity Work From 40 Mva Transformer At 132 Kv Sub-station Awas Vikas Under Etd-i
Repairing And Overhauling Of 33/0.420kv, 250kva, Pme Make Station Transformer At 220 Kv Sub Station, Motiram Adda, Gorakhpur Under Electricity 400 Kv Sub-station Division
Centrifuging Of 200mva, Aditya Make And 160 Mva Emco Make Power Transformer-ii Installed 400kv Sub Station Sarnath
Shifting Of Transformer From The Sub Station To Outside In The Open Area At Civil Hospital Sec-6, Panchkula Recall