Construction Of 1 2M Wide Pathway From Steps To Adventure Park Area, 2 Reflexology Path, 3 Green Tunnels 4 Nos. At Forest Survey No. 577, Rethare Dharan Eco Tourism Center, Shirala Forest Range Of Sangli Forest Division
Electrical Work In C/w Improvement Of Lighting Arrangements In Ventilated Tunnels T-25, T-23, T-07, Station Yards, Circulating Areas, Colonies, Etc., Over Bjpl-svdk Section.
Spillways /dams /barrages / Aqueducts / Bridges/head Regulater/ Cross Regulater/tunnels/ Syphan, Falls, Canals Construction Works/ Canal Pacca Works/canal Lining Works/ Drains Construction Works/ Drains Pacca Works, Construction Of Ghat/ Cattel Ghat.
Measures To Be Taken To Leakage Seepage In Side Cross Tunnels Reg. Sh Providing Engineering Solution Of Leakage Seepage Problem Of Sub Soil Water In Cross Tunnel1 Basement 2Nd Side Measures To Be Taken To Leakage Seepage In Side Cross Tunnels
Construction Of 1. 1M Pathway At Butterfly Garden, 2. 2M Pathway Khambale No. 1 - At Selfie Point And Tulsi, 3. Chain Link Fencing, 4. Green Tunnels - 3 Nos, 5. Artificial Waterfall, 6. Information Boards At Gat No 422-1, Oxygen Park, Khambale Bh
Complete Track Renewal (p) Inside Four Tunnels And On Four Major Bridges Between Km 571/000 To Km 610/000 Of Honavar-bhatkal Sections Under Senior Engineer, Udupi And Four Tunnels Under Sen/mao Section In Karwar Region Over Konkan Railway (computer No.66068 ( Rates Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable)
Routine Day To Day Maintenance Including Removal Of Garbage, Calcination From Power House Caverns, Bathrooms, Audits Tunnels Area Adjacent To Ph For The Year 2025 26 And 2026 27 With Power House Internal Maintenance Work Like Removal Of Silt From Lea
Repairing Of Heavily Distressed Intermediate Columns, Walls & Roof In Tunnels Between Mahanayak Uttam Kumar (kmuk) To Jatin Das Park (kjpk) And Esplanade (kesp) To Central (kcen) Stations Of Metro Railway, Kolkata.
Provision Of Rag Bolt Inside Tunnels (nutun, Mbq, Parsik, Belapur Hb & Bsu Line) In Mumbai Division
Routine Day To Day Maintenance Including Removal Of Garbage, Calcination From Power House Caverns, Bathrooms, Audits Tunnels Area Adjacent To Ph For The Year 2025 26 And 2026 27 With Power House Internal Maintenance Work Like Removal Of Silt From