Purchase Of Ultrasonic Pulse Velocity Tester For The Non-Destructive Evaluation Of Concrete Homogeneity.With Inbuilt Waveform Display -A-Scan, 50 Khz, Dry Point Contact, Couplant Free Array Of 7 Transducers, Memory 50000 Readings, Velocity Range 1000- Purchase Of Ultrasonic Pulse Velocity Meter For Quality Control Lab Kottayam
Gem Bid For Portable Liquid Ultrasonic Flow Meter(ongc) (q3)
Gem Bids For Ultrasonic Thickness Gauge, Industrial Borescopetelescopic Mirror, Pit Gauge, Sprit Level, Hand Magnifierscale Magnifier Illuminated Magnifier, Spark Less Safetytorch, Surface Finish Tester Profile Meter, Binocular, Ultrasonic Leak Detector, Rubber Hardness Tester, Universal Welding Gauge, Paint Inspection Gauge Dftgauge, Wet Film Wheel Wet Film Thickness Gauge, Digitalsurface Profile Gauge, Holiday Detector, Adhesion Testerdolly Type, Cross Hatch Adhesion Tester, Pict Oral Book Ofsurface Standards, Portable Skid Resistance Tester, Digitalmultimeter, Portable Reference Electrode, Multi Gasdetector, Portable H2s Sensor, Hot Wire Anemometer Vaneanemometer Digital Anemometer, Whirling Hygrometerdigital Thermos Hygrometer Dew Point Calculator, Infraredthermometer Analogue Thermometer, Ultrasonic Hand-held Flow Meter, Universal Indoor Air Quality Iaq Measuringdevice, Sound Level Meter Noise Dosimeter, Digital Luxmeter, Infrared Distance Measuring Sensor
Gem Bids For Digital Caliper 150, Digital Caliper 300, Digital Caliper1000, Digital Outside Micrometer 25, Digital Outsidemicrometer 50, Laser Distance Meter, Coating Thicknessmeter, Ultrasonic Thickness Meter, Digital Height Gauge, Surface Plate, Magnetic Stand, Digital Dial Indicator, Digital Universal Bevel Protector, Digital Infraredthermometer, Measuring Tape, Multimeter, Magneticspirit Level
Gem Bids For Group-1 Total Lump Sum Price Of Smaw Equipment-04 Nos (02 Nos. In Talcher Project And 02 Nos. In Lara Project) And Gtaw Equipment -04 Nos (02 Nos. In Talcher Project And 02 Nos. In Lara Project) Along With All Accessories Including Freight And Gst Group-1- Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Of Tender Group-1- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-2-total Lump Sum Price For Videoscope/borescope For Boiler Tube,header Inspection And Retrieval Tool-02 Nos. (01 In Talcher And 01 In Lara Project) And Video Image Scope With Measuring Facility-02 Nos. And Magnifying Glass-08 Nos. Along With All Accessories-08 Nos. (04 In Talcher And 04 In Lara Project) Please Refer Price Schedule Group-2 -total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Of Tender. Group-2 - Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-3-total Lump Sum Price For Portable X-ray Residual Stress System-02 Nos (01 Nos. In Talcher Project And 01 Nos. In Lara Project) Along With All Accessories-please Refer Price Schedule Group-3 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule. Group-3 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 010 Visit In Lara Group-4-total Lump Sum Price For Abi (automated Ball Indentation) Tester For Mechnical Propoerties-02 Nos (01 Nos. In Talcher & 01 Nos. In Lara Project) Along With All Accessories-please Refer Price Schedule Group-4 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Group-4 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-5 - Total Lump Sum Price For Magnetic Particle Inspection Yoke Type-02 Nos (01 In Talcher And 01 In Lara), Pie Gauge For Mpi-02 Nos (01 In Talcher And 01 In Lara), Radiography Film Densitometer-02 Nos (01 In Talcher And 01 In Lara) , Uv Lamp For Fluorescent Mpi And Dpt-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories-please Refer Price Schedule Group-5 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule N Group-5 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Group-6 -total Lump Sum Price Radiation Survey Meter-02 Nos (01 In Talcher And 01 In Lara), Personal Digital Dosimeter-04 Nos (02 In Talcher And 02 In Lara), Ultrasonic Testing Machine-conventional With Probes And Calibration Blocks-02 Nos (01 In Talcher And 01 In Lara) With All Accessories Group-6- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-6 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-7-total Lump Sum Price Digital Radiography-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-7- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara. Please Refer Price Schedule Group-7 - Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara.please Refer Price Schedule. Group-8- Total Lump Sum Price For Optical Microscope For Replica Interpretation,optical Microscope And Image Analysis System, Stereo Microscope With Camera Attachment-02 Nos(01 In Talcher And 01 In Lara) Alongwith All Accessories Along With All Accessories Group-8- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-01 Days In Talcher And 01 Days In Lara Group-8- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-9- Total Lump Sum Price-computed Radiography-cr-scanner-02 Nos-(01 In Talcher And 01 In Lara) Alongwith All Accessories Please Refer Price Schedule Group-9- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-9- Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-10-total Lump Sum Price-hardness Tester -rebound Type-02 Nos (01 In Talcher And 01 In Lara) And Hardness Tester_uci Method-02 Nos-(01 In Talcher And 01 In Lara)along With All Accessories Group-10- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-10- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-11-total Lump Sum Price For Radiography Film Viewer-04 Nos (02 In Talcher And 02 In Lara), Radiography Film Samples-asme-02 Nos (01 In Talcher And 01 In Lara) , Magnetic Particles Inspection-coil Type With Cable-02 Nos (01 In Talcher And 01 In Lara), Gaussmeter For Mpi-02 Nos (01 In Talcher And 01 In Lara) , Ni-cr Panel For Dpt-02 Nos (01 In Talcher And 01 In Lara). Please Refer Price Schedule Group-11- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-11- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-12-total Lump Sum Price For Hardness Tester-02 Nos (01 In Talcher And 01 In Lara), Exfoliation Meter For Ss Tubes-02 Nos (01 In Talcher And 01 In Lara), Thermography Camera-02 Nos (01 In Talcher And 01 In Lara), Holiday Detector-02 Nos (01 In Talcher And 01 In Lara), Engineering Stethoscope-02 Nos (01 In Talcher And 01 In Lara), Portable Vibration Meter-02 Nos (01 In Talcher And 01 In Lara), Comparator-02 Nos (01 In Talcher And 01 In Lara), Surface Roughness Meter-02 Nos (01 In Talcher And 01 In Lara), Spirit Level-04 Nos (02 In Talcher And 02 In Lara), Noise Level Meter-02 Nos(01 In Talcher And 01 In Lara), Torgue Wrench-02 Set (01 In Talcher And 01 In Lara), Pressure Gauge-04 Nos (02 In Talcher And 02 In Lara), Mercury Thermometer-04 Nos (02 In Talcher And 02 In Lara), Infrared Thermometer-02 Nos (01 In Talcher And 01 In Lara), Digital Thermometer _n-contact_-02 Nos(01 In Talcher And 01 In Lara), Digital Thermometer Contact-type-02 Nos(01 In Talcher And 01 In Lara),thermocouple Test-4 Nos(02 In Talcher And 02 In Lara), Barometer -aneroid-08 Nos(04 In Talcher And 04 In Lara), Mameter-test And U Tube-02 Nos (01 In Talcher And 01 In Lara),hygrometer-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-12-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-10 Days In Talcher And 10 Days In Lara Group-12-total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-13-total Lump Sum Price For Replica Kit For In-situ Metallography-02 Nos (01 In Talcher And 01 In Lara), Sample Preparation Tools_machines-02 Set(01 In Talcher And 01 In Lara), In-situ Metallogrpahy Kit-grinder And Polisher With Accessories-02 Set(01 In Talcher And 01 In Lara) Along With All Accessories Group-13- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-06 Days In Talcher And 06 Days In Lara Group-13- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-14-total Lump Sum Price For Mcf_magnetic Stauroscope_for Assessment Of Quality Of Pwht-02 Nos, Argon Purity Tester-02 Nos(01 In Talcher And 01 In Lara), Inspector Kit For Welding Inspection-02 Nos(01 In Talcher And 01 In Lara),temperature Gun-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-14- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-14- Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-15-total Lump Sum Price For Binoculars-04 Nos(02 In Talcher And 02 In Lara), Laser Alignment Kit With Target Kit-02 Nos(01 In Talcher And 01 In Lara), Along With All Accessories Group-15-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-15- Total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-16-total Lump Sum Price For Remote Field Eddy Current Testing_advance Electro Magnetic Testing-02 Nos (01 In Talcher And 01 In Lara), Along With All Accessories Group-16-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-16-total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-17-total Lump Sum Price For Helium Leak Detector-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-17-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-17- Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-18-total Lump Sum Price For Oxide Measurement For Boiler Tubes-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-18-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-18-total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-19-total Lump Sum Price For Ultrasonic Thickness Meter_d-meter-digital-04 Nos (02 In Talcher And 02 In Lara), Vernier 300 Mm Scale-04 Nos (02 In Talcher And 02 In Lara),vernier 600 Mm Scale-04 Nos (02 In Talcher And 02 In Lara), Outside Micrometre-04 Nos (02 In Talcher And 02 In Lara), Inside Micrometer 25-750_dial-04 Nos (02 In Talcher And 02 In Lara), Measuring Tape-04 Nos (02 In Talcher And 02 In Lara), Paint Thickness Meter_elcometer-ultrasonic Digital-02 Nos (01 In Talcher And 01 In Lara), Paint Adhesion Testing Kit-02 Nos(01 In Talcher And 01 In Lara),internal Oxide Scale Measuring System With Probe_utbased-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-19- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-19-total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-20-total Lump Sum Price For Welding Simulator-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-20-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-20-total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara
Supply, Installation, Testing And Commissioning Of 4 No. Microprocessor Based Field Mounted Dual Path Ultrasonic Flow Meter For Rsd
Gem Bids For Ultrasonic Pulse Velocity Meter
Invitation To Pre-Tender Meeting For Ultrasonic Flow-Meter For Bio Atf Project, Mrpl
Gem Bids For Ultrasonic Flow Meter Based Filtration Metering Letdownskid For Natural Gas Application
Gem Bids For Lab, Rotary Microtome , Colorimeter, Prizm Abs Uv Vis Spectrophotometer, Uv Transilluminator, Electronic Weighing Balance, Magnetic Stirrer With Electronic Speed Regulator And Hot Plate, Bunsen Burnes Brass, Compound Trinocular Microscope, Remi Rm 02 Plus Mini Centrifuge, Constant Temperature Bath, Digital Polarimeter, Colorimeter, Distillation Unit, Magnetic Stirrer With Hot Plate, Auto Dispenser, White Board, Magnetic Hysteresis Tracer, Dielectric Constant Measurement Setup, Thermal Conductivity Measurement Setup, Water Bath, Digital Ph Meter, Vaccum Pump, Lcr Meter, Helium Lamp, Ultrasonic Interferometer, Malu's Law Apparatus, De Humidifier, Mantle Heater, Electronic Pippets, Katers Pendulum, Microammeter, Arduino Uno R3 Board Expepyes Kit Iuac Experimental Science Kit, Mirror Galvanometer, Hall Effect Instruments, Gaussmeter, Thomson's E/m Experiment, Dc Power Supply, Diffraction Grating, Rotary Compressor, Digital Multimeter, Sphygmomanometer, Stethescope, Binocular Microscope, Stereozoome Microscope, Binoculars, Digital Camera, Chromatography Chamber, Ammonium Fitter