Ipgmer-sskm Hospital ---- Periodical Cleaning And Disinfecting Of Underground Water Tank Of Masonry Reservoir By Rotary Jet Machine During The Year 2025-2026. Wbpwd/kshd/ee/nit-19 Of 2025-2026 Sl.01
Construction Of Underground Water Tank Of 200000 Liters Capacity At Bhariyal Dumping Site
I Balance Work Of Fob At Girwar, Isharwara, Sumreri, Cop Work At Pathariya, Ganeshganj And Sumreri And Circulating Area At Pathariya Ii Repairs Of Different Service Buildings In Between Malkhedi To Pathariya Iii Improvement To Ganeshganj Station Yard. Iv Sp & Ssp In Between Baghora To Pathariya V Balance Work Of Construction Of Station Building, Ibh Building, End Goomty, Gate Lodge, Sp, Ssp, Quarter, Road Work, Hs Tank, Underground Water Storage Tank, Pressure Filter Shifting And Other Miscellaneous Work Between Aslana Station To Golapatty Station In Connection With Bina-Kte 3Rd Line Project.
Acsmt-cleaning Of Valley Gutter Of Cop And Repairs To Leakage Of Roofing At Csmt Station Under Sse/w/csmt. B Wdi-cleaning Of Underground Drainage System, Manhole And Water Storage Tanks At Wdi Csmt Under Sse/w/wdi. Cbp- Cleaning Of Underground Sewerage Line, Manholes, Underground And Overhead Water Tank At L Block, R Block, Janjeera Chamber, Beryl House, Roshera Mahal, Greyland And 5 Cuffe Parade Etc. At Badhwar Park Under Sse/w/bp. D Wb- Cleaning Of Open Underground Drainage Line, Valley Gutter, Storage Water Tank, Repairs To Leaky Soil And Vent Drainage Line & Chamber Sanitary Fitting Of Msd Station To Vdlr Station, Mhl Colony, Bd Chawal, Ms Chawl, Gprd Colony Building No. Rb/i/496, Rb/i/497 And Services Building, Ncc Etc. At Wadibunder Under Sse/w/wb.
Sinking Of 01 No. Production Well And Construction Of Underground Rcc Water Tank With Associated Pump Room At Ohpc Corporate Office,
Mechanical Cleaning And Sterilization Of Various Size Of Overhead Tank Underground Sump And Swimming Pool And Connect Ed Repair Work Of Oht Incl Out Pocket
Construction Of 04 Nos Of Rcc Wall For Underground Water Tank Incl. Laying And Fitting Of Pipeline In Development /Widening And Depillaring Panel Cm Panel C1 And C2 In Vi Top Seam At Bangwar Ug Minefor The Year 2024-25 And 2025-26
Construction Of Underground Rain Harvesting Water Tank For Irrigation Purpose At Near House Of Sh. Hitender Kumar And Other At Panjethi W. No. 7 Talyahar
Construction Of Underground Rain Harvesting Water Tank Near House Of Sh. Pawan And Other At Lower Panjethi At W. No. 7 Talyahar Mandi H.p
Rainwater Will Be Stored In Underground Heavy Duty Tanks And The Water Will Be Used For Household Purposes. Supply, Installation And Comm. Of Rooftop Rainwater Harvesting Underground Tank With Complete Fitting And All Accessories I.e Isi Made Pipes, Filter And Underground Polymer Heavy Duty Water Tank Of 3000 Litre Capacity For Hodal Block.