Construction Of Additional V.r.b. At Ch. 14700 Mt On Dlbmc.
Estimate For Extension Of V.r.b. At Km. 42.400 Of Marihan Branch.
Constructing A Box Type Vrb In Place Of Existing Vrb At Ch.21350m & 22550m Of Chalthan Branch Canal
Restoration Of Damaged Lining And Vrb At Various Section Of 24r Distry And 14r Minor Of 24r Distry Of P.m.c At Village Vadi, Ta.shahera
Constructing Work Of Pipe Vrb In Dm2l And Dm3l Of Srbmc, Lining Repairing Work Of M3r And Sm7l Of Vadnagar Distributory And Fall Repairing Work Of Vadnagar Distributory Ch. 1340 And 1590 Mt
Improvement Of Existing Irrigation Infrastructure Works On Vrb Cum Hr Cum Cr 8060m(26rd) On Amalsad Branch Canal
Restoration Of Existing Cr Cum V.r.b. At Ch. 27380 M (90.685-rd) Of Ubharat Branch Canal.
Reconstruction Of Pipe Vrb At Ch. 8.1 And 8.8 Km. Of Main Canal And Ch. 0.00, 2.00 And 2.5 Km. Of Minor D-1 And Ch. 0.50 Km. Of Minor D-7 Of Puna Irrigation Scheme Year 2025-26.
Constructing Rcc Box Type Barrel In Place Of Existing Damaged Vrb @ Ch.5200 Meter On Nadiad Dabhan Zarol Lateral Drain(davda Ramnagar Sim Vistar)
Constructing Of Box Vrb Ch.2000 Mt. And Ch.3600 Mt. In Place Of Existing Pipe Vrb On Manghroli To Shedhi River Drain Near Village Mohrel.