"नये भारत का नया Tender Portal"
Request a call back

walk in cooler Tenders | Latest Tenders for walk in cooler

Tender Bharat Website covers all Tenders for walk in cooler – Including walk in cooler Government Tenders, e Tender walk in cooler, walk in cooler Tenders and Private Tenders. There is no shortage of business opportunities from the largest walk in cooler Tender Database.

Our website allows you to find walk in cooler tenders online quickly and easily. Subscribers can also opt to receive daily tender alerts through email from TenderBharat.com to guarantee they don't miss out on any opportunities.

walk in cooler Tenders

Total 186 walk in cooler tenders found
#TBR: 34682685 New

Health Services And Equipments

  • Telangana
  • Due On: 27 Jun, 2025 (4 Days Left)

Procurement And Supply Of -- To Government Hospitals / stitutions Telangana State Under Rate Contract For A Period Of 2 Years

Ref. Document
View Tender
#TBR: 34660031 Live

Construction

  • Bihar
  • Due On: 23 Jun, 2025 (0 Days Left)

Gem Bids For 4 Q3

Ref. Document
View Tender
#TBR: 34634336 Closed

Health Services And Equipments

  • Kerala
  • Due On: 18 Jun, 2025 (0 Days Left)

Supply Of

6.00 Lacs
View Tender
#TBR: 34597117 Closed

Municipal Corporation

  • Maharashtra
  • Due On: 11 Jun, 2025 (0 Days Left)

The Work Of Replacement Of At Blood Bank Of Dr R.N.Cooper Hospital Vile Parle W.

Ref. Document
View Tender
#TBR: 34336006 Closed

Health Services/equipments

  • Andaman And Nicobar Islands
  • Due On: 16 Apr, 2025 (0 Days Left)

Repair And Replacement Of Spares Dental Chair stalled At Gbph, Chc Nancowrie And - - Repair And Replacement Of Spares Dental Chair

Ref. Document
View Tender
#TBR: 34283822 Closed

Air Transport

  • Tamil Nadu
  • Due On: 19 Apr, 2025 (0 Days Left)

Gem Bids For "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions First Year 1.5tr/2tr Sgle Phase verter Split Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions First Year 2tr Sgle Phase Cassette Type Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions First Year 3tr Sgle/three Phase verter Split Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions First Year 3tr Sgle/three Phase verter Type Cassette Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions First Year 4tr Three Phase verter Cassette/tower Type Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions Second Year 1.5tr/2tr Sgle Phase verter Split Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions Second Year 2tr Sgle Phase Cassette Type Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions Second Year 3tr Sgle/three Phase verter Split Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions Second Year 3tr Sgle/three Phase verter Type Cassette Ac Unit" "periodical Matenance Of Followg Air Conditioners Of All Makes At Different Locations cludg Providg All Consumables, Refrigent Gas And Spares Etc., Except Replacement Of Compressors Complete As Required As Per Special Conditions Second Year 4tr Three Phase verter Cassette/tower Type Ac Unit" "all clusive Comprehensive Matenance Contract For Followg Vrf Airconditiong System cludg Compressor, door And Outdoor Units, terlkg Refrigerant, Power Control Button Panel And Draage Les To Mata System To A Satisfactory Level Of Performance As Per Special Conditions Of Contract. First Year 2nos X20 Hp Vrf Outdoor Unit With Dc vertor Scroll Compressor Along With door Units Of Capacities 4x8 Tr Ductable Units " "all clusive Comprehensive Matenance Contract For Followg Vrf Airconditiong System cludg Compressor, door And Outdoor Units, terlkg Refrigerant, Power Control Button Panel And Draage Les To Mata System To A Satisfactory Level Of Performance As Per Special Conditions Of Contract. First Year 10 Hp Vrf Outdoor Unit With Dc vertor Scroll verter Compressor Along With door Units Of Capacities 4x2tr Split Units " "all clusive Comprehensive Matenance Contract For Followg Vrf Airconditiong System cludg Compressor, door And Outdoor Units, terlkg Refrigerant, Power Control Button Panel And Draage Les To Mata System To A Satisfactory Level Of Performance As Per Special Conditions Of Contract. First Year 14 Hp Vrf Outdoor Unit With Dc vertor Scroll verter Compressor Along With door Units Of Capacities 3x3.3 Tr Cassette Units " "all clusive Comprehensive Matenance Contract For Followg Vrf Airconditiong System cludg Compressor, door And Outdoor Units, terlkg Refrigerant, Power Control Button Panel And Draage Les To Mata System To A Satisfactory Level Of Performance As Per Special Conditions Of Contract. Second Year 2nos X20 Hp Vrf Outdoor Unit With Dc vertor Scroll Compressor Along With door Units Of Capacities 4x8 Tr Ductable Units " "all clusive Comprehensive Matenance Contract For Followg Vrf Airconditiong System cludg Compressor, door And Outdoor Units, terlkg Refrigerant, Power Control Button Panel And Draage Les To Mata System To A Satisfactory Level Of Performance As Per Special Conditions Of Contract. Second Year 10 Hp Vrf Outdoor Unit With Dc vertor Scroll verter Compressor Along With door Units Of Capacities 4x2tr Split Units " "all clusive Comprehensive Matenance Contract For Followg Vrf Airconditiong System cludg Compressor, door And Outdoor Units, terlkg Refrigerant, Power Control Button Panel And Draage Les To Mata System To A Satisfactory Level Of Performance As Per Special Conditions Of Contract. Second Year 14 Hp Vrf Outdoor Unit With Dc vertor Scroll verter Compressor Along With door Units Of Capacities 3x3.3 Tr Cassette Units " "periodical Matenance Of Ac Units At Unit Havg The Capacity Of 34000btu To Hr And Enable To Mata 02 To 08degreec cludg Providg All Consumables, Spares Parts, Gas Chargg Etc., Complete As Required As Per Special Conditions. First Year" "periodical Matenance Of Ac Units At Unit Havg The Capacity Of 34000btu Hr And Enable To Mata 02 To 08degreecel cludg Providg All Consumables, Spares Parts, Gas Chargg Etc., Complete As Required As Per Special Conditions. Second Year" "comprehensive Periodical Matenance Of Reverse Osmosis Plant Of The Followg Capacity Of 250lph Make Water Clear Tech, As Per The Manufactures Standards, cludg All Spare Parts Like Membrane, Plc Board Etc., Renderg Servicg To The Units Once 3 Months And As And When Required Complete As Per The Scope Of Work As Enclosed. First Year" "comprehensive Periodical Matenance Of Reverse Osmosis Plant Of The Followg Capacity Of 250lph Make Water Clear Tech, As Per The Manufactures Standards, cludg All Spare Parts Like Membrane, Plc Board Etc., Renderg Servicg To The Units Once 3 Months And As And When Required Complete As Per The Scope Of Work As Enclosed. Second Year" "comprehensive Periodical Matenance Of R.o Purifier Cum Water Units (cludg Compressor) Of Up To 80/80 Ltr Capacity, Sgle Phase, 230 V, 50 Hz, Of Different Makes stalled At Different Locations cludg Providg All Necessary Consumables, Refrigerant Gas And Spares Etc., Complete As Required First Year" "comprehensive Periodical Matenance Of R.o Purifier Cum Water Units (cludg Compressor) Of Up To 80/80 Ltr Capacity,sgle Phase, 230 V, 50 Hz, Of Different Makes stalled At Different Locations cludg Providg All Necessary Consumables, Refrigerant Gas And Spares Etc., Complete As Required Second Year" Comprehensive Periodical Matenance Of 04 Nos Zero B Make R.o Purifier Cum Water Units Of With Coolg Capacity Of 150ltr/hr And Havg Storage Capacity Of 150ltrs (cludg Compressor) Of Sgle Phase, 230 V, 50 Hz, stalled At Different Locations cludg Providg All Necessary Consumables, Refrigerant Gas And Spares Etc., Complete As Required (model No. Eco Chill 150lph- Ssecos15015015150) Comprehensive Periodical Matenance Of 06 Nos Zero B Make R.o Purifier Cum Water Units Of With Coolg Capacity Of 60ltr/hr And Havg Storage Capacity Of 80 Ltrs (cludg Compressor) Of Sgle Phase, 230 V, 50 Hz, stalled At Different Locations cludg Providg All Necessary Consumables, Refrigerant Gas And Spares Etc., Complete As Required. (model No. Ssroch 608050) "comprehensive Periodical Matenance Of R.o Water Filter Cum Purifiers Of Different Capacity,sgle Phase, 230 V, 50 Hz, Of Different Makes stalled At Different Locations cludg Providg All Necessary Consumables And Spares Etc., Complete As Required. First Year" "comprehensive Periodical Matenance Of R.o Water Filter Cum Purifiers Of Different Capacity,sgle Phase, 230 V, 50 Hz, Of Different Makes stalled At Different Locations cludg Providg All Necessary Consumables And Spares Etc., Complete As Required. Second Year" "comprehensive Periodical Annual Matenance Contract cludg Periodical, Preventive, Break Down Visits / Matenance, Supply And Replacement Of All Components, Accessories Pertag To Wall/structural Mounted Drkg Water Founta tegral Bottle Fillg Station With Chiller 30 Liters Per Hour Made Of Staless Steel cludg Pressure Boostg Device Consists Of Hydronuematic Pressure Tank And Reverse Osmosis System Of 50 Lph Consistg Of Pre-filter, 20ch Commercial Grade Filters- Sediment Filter, Carbon Filter, Ro Membrane, Post Carbon Filter With Uv Sanitization System cludg Gi Skid Mountg, Complete strumentation Viz Pressure Gauge, Rota Meter, Auto Flush System, Valves , Dra System, Coolg System, Purification System, Gas Chargg Etc., Complete And As Per Special Conditions Attached. First Year" "comprehensive Periodical Annual Matenance Contract cludg Periodical, Preventive, Break Down Visits / Matenance, Supply And Replacement Of All Components, Accessories Pertag To Wall/structural Mounted Drkg Water Founta tegral Bottle Fillg Station With Chiller 30 Liters Per Hour Made Of Staless Steel cludg Pressure Boostg Device Consists Of Hydronuematic Pressure Tank And Reverse Osmosis System Of 50 Lph Consistg Of Pre-filter, 20ch Commercial Grade Filters- Sediment Filter, Carbon Filter, Ro Membrane, Post Carbon Filter With Uv Sanitization System cludg Gi Skid Mountg, Complete strumentation Viz Pressure Gauge, Rota Meter, Auto Flush System, Valves , Dra System, Coolg System, Purification System, Gas Chargg Etc., Complete And As Per Special Conditions Attached. Second Year" "comprehensive Periodical Matenance Of Refrigerators cludg Stabilizer (stalled If Any), (cludg Compressor) Of Up To 200 Ltr Capacity,sgle Phase, 230 V, 50 Hz, Of Different Makes stalled At Different Locations cludg Providg All Necessary Consumables, Refrigerant Gas And Spares Etc., Complete As Required. First Year" "comprehensive Periodical Matenance Of Refrigerators cludg Stabilizer (stalled If Any), (cludg Compressor) Of Up To 200 Ltr Capacity,sgle Phase, 230 V, 50 Hz, Of Different Makes stalled At Different Locations cludg Providg All Necessary Consumables, Refrigerant Gas And Spares Etc., Complete As Required. Second Year" Shiftg And stallation Of Existg Or New 1.5tr/2tr/3tr/4tr Sgle / Three Phase Split / Cassette / Floor Mounted/ Ceilg Suspended Ac Unit cludg Supply And Layg Of Refrigeration Pipes Upto 5mtr With sulation, Control Cables, Gas Chargg Etc., Complete As Required. Supply And Layg Of Refrigerant Copper Pipg For 1.5tr / 2tr Capacity Of Different Type Ac Units, Both Suction And Discharge Along With Suitable Thermal sulation And Electrical Cable Of Size 4 Core X 4 Sq. Mm Copper Conductor For Connection From door To Outdoor Unit And Suitable Necessary Accessories For Connection Complete As Required. (two Lengths Of Suction And Discharge Pipg And One Length Of Copper Wire Shall Be Measured One Meter For This Item) Supply Of Refrigerant Copper Pipg For 3tr / 4tr Capacity Of Different Type Ac Units, Both Suction And Discharge Along With Suitable Thermal sulation And Electrical Cable Of Size 4 Core X 4 Sq. Mm Copper Conductor For Connection From door To Outdoor Unit And Suitable Necessary Accessories For Connection Complete As Required. (two Lengths Of Suction And Discharge Pipg And One Length Of Copper Wire Shall Be Measured One Meter For This Item) Supply Of Rotary Compressor Suitable For verter Type 1.5tr Split Ac Units cludg As And When Required Supply Of Rotary Compressor Suitable For Non verter Type 1.5tr Split Ac Units As And When Required Supply Of Rotary Compressor Suitable For verter Type 2 Tr Split/cassette Ac Units cludg As And When Required Supply Of Rotary Compressor Suitable For Non verter Type 2 Tr Split/cassette Ac Units As And When Required Supply Of Rotary Compressor Suitable For verter Type 3 Tr Split/cassette Ac Units cludg As And When Required Supply Of Rotary Compressor Suitable For Non verter Type 3 Tr Split/cassette Ac Units As And When Required Supply Of Rotary Compressor Suitable For Non verter Type 4tr Cassette Ac Units cludg Makrg Arrangement Etc., As And When Required

Ref. Document
View Tender
#TBR: 34265879 Closed

Health Services/equipments

  • Andaman And Nicobar Islands
  • Due On: 14 Apr, 2025 (0 Days Left)

Gem Bids For 1 Q3

Ref. Document
View Tender
#TBR: 34258312 Closed

Security Services

  • Maharashtra
  • Due On: 10 Apr, 2025 (0 Days Left)

Repair Replacement Of Summer Coolg Appliances And ternal Electrification And Other Allied E M Work Area Of Aicts Vikram Batra Map Phase I Jcos Ors And Md Accn And Other Connected Area Age E M I Ge S Pune 8673 Preventavie Mat Repair Replacement Of Summer Coolg Appliances r And ternal Electrification And Other Allied E M Work Area Of Aicts Vikram Batra Map Phase I Jcos Ors And Md Accn And Other Connected Area Age E M I Ge S Pune

49.00 Lacs
View Tender
#TBR: 34134865 Closed

Education And Research Institutes

  • Karnataka
  • Due On: 13 Mar, 2025 (0 Days Left)

Supply of 50 Q3

Ref. Document
View Tender
#TBR: 34126111 Closed

Security Services

  • Uttar Pradesh
  • Due On: 21 Mar, 2025 (0 Days Left)

Repair / Replacement And Mat Of Central Ac Plants -- Ductable Ac At Afmsd 25 Weu Receiver Stn And 223 Fd Wksp The Area Of Age E/M Ext Ws Under Ge E/M Lucknow

45.00 Lacs
View Tender
Download Document